My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
09-23-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2024 4:19:32 PM
Creation date
10/25/2024 4:12:57 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City's Comprehensive Plan, official controls, platting or dedication requirements enacted after the <br />date of this Agreement with respect to property which did not receive final plat or development <br />approval less than two (2) years prior to any such amendments. <br />5. REDEVELOPMENT PLANS. The Subject Property shall be developed in <br />accordance with the plans submitted for the Master Plan PUD, Final PUD Plan, and Conditional <br />Use Permit as reviewed and approved by the City on July 22, 2024 (collectively, the "Plans"). The <br />Plans shall not be attached to this Agreement. The Plans may be prepared, subject to City approval, <br />after entering the Agreement, but before commencement of any work in the PUD or on the Subject <br />Property. If the Plans vary from the written terms of this Agreement, the approved plans shall <br />control. <br />6. IMPROVEMENTS. The Developer shall install and pay for the following <br />improvement ("Improvement") as required to be built within the project in accordance with the <br />approved Plans: <br />A. Parking Lot Improvements and Driveway Access <br />• To relocate the driveway access including curbing so that it is <br />entirely located within the non -vacated portion of Connelly Avenue <br />in a manner compliant with City Code; <br />• Removal of the existing covered parking structure; and <br />• Addition of parking islands for additional landscaping and area <br />lighting for the parking lot. <br />B. Concrete Curb and Gutter <br />C. Site Grading, Ponding, and Erosion Control <br />D. Landscaping <br />E. Underground Utilities <br />F. Surveying and Staking <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.