My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
09-23-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2024 4:19:32 PM
Creation date
10/25/2024 4:12:57 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Improvement to the Exterior Finishes of the Principal Structure <br />The Improvements shall be installed in accordance with the City Code. The Developer will not use <br />power equipment between the hours of 7:00 p.m. and 7:00 a.m. The Developer shall submit plans <br />and specifications for permits, which have been prepared by a competent registered professional <br />engineer to the City for approval by the City Engineer, which approval shall be provided on the <br />condition that such submittals comply with the Plans and this Agreement. The Developer shall <br />instruct its engineer to provide adequate field inspection personnel to assure an acceptable level of <br />quality control. In addition, the City may, at the City's discretion and at the Developer's expense, <br />have one or more City inspectors inspect the work as the City may reasonably determine, provided <br />that such City inspections are conducted on a reasonable cadence and not more frequently than <br />necessary to avoid unnecessary Developer expenses relative to such City inspections. The <br />Developer, its contractors and subcontractors, shall follow all instructions received from the City's <br />inspectors. The Developer or Developer's engineer shall provide for on -site project management. <br />The Developer or Developer's engineer is responsible for design changes and contract <br />administration between the Developer and the Developer's contractor. The Developer or <br />Developer's engineer shall schedule a pre -construction meeting at a mutually agreeable time at <br />Arden Hills City Hall, or location designated by City staff, with all parties concerned, including <br />City staff, to review the program for the construction work. <br />7. OWNERSHIP OF IMPROVEMENTS. Upon completion of the work and <br />construction required by this Agreement, the Improvements lying within public easements shall <br />become City property without further notice or action. Upon completion of the public <br />improvements, the City shall inspect the public improvements and notify Developer if any of the <br />improvements do not conform to the requirements of this Agreement. Upon compliance with this <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.