Laserfiche WebLink
12. EROSION CONTROL. Prior to initiating site grading, the erosion control plan <br />shall be implemented by the Developer and inspected and approved by the City. The City may <br />impose additional erosion control requirements if reasonably required. All areas disturbed by the <br />excavation and backfilling operations shall be stabilized immediately when it is known that <br />construction activities will not resume for fourteen (14) days after the completion of the work, <br />weather permitting, or plan to utilize temporary cover on portions of the site that will sit dormant <br />for these periods of time whether or not final grading has been completed unless authorized and <br />approved by the City Engineer. Except as otherwise provided in the erosion control plan, seed <br />shall be in accordance with the City's current seeding specification which may include certified <br />oat seed to provide a temporary ground cover as rapidly as possible. All seeded areas shall be <br />maintained as necessary for seed retention. The parties recognize that time is of the essence in <br />controlling erosion. If the Developer does not comply with the erosion control plan and schedule <br />or supplementary instructions received from the City, the City may take such action as it deems <br />appropriate to control erosion. The City will notify the Developer in advance of any proposed <br />action, but failure of the City to do so will not affect the Developer's and City's rights or <br />obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred <br />for such work within ten (10) days, the City may draw down the letter of credit to pay any costs. <br />No development, street or utility construction will be allowed and no building permits will be <br />issued unless the plat is in full compliance with the approved erosion control plan. <br />13. GRADING PLAN. The property shall be graded in accordance with the approved <br />grading development and erosion control plan. The plan shall conform to City of Arden Hills <br />specifications. Within thirty (30) days after completion of the grading and before the City approves <br />individual building permits the Developer shall provide the City with an "as constructed" grading <br />7 <br />