My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
09-23-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2024 4:19:32 PM
Creation date
10/25/2024 4:12:57 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement with respect to public improvements, the City shall give formal notice of acceptance <br />to Developer and thereafter Developer shall have no responsibility with respect to the maintenance <br />of the public improvements, except during any warranty periods. <br />8. WARRANTY. The Developer warrants all public improvements required to be <br />constructed by it pursuant to this Agreement for a period of twenty-four (24) months from the date <br />of acceptance by the City against poor material and faulty workmanship. All trees and shrubs shall <br />be warranted to be alive, of good quality, and disease free for twenty-four (24) months after <br />planting. Any replacement trees and/or shrubs shall be warranted for twenty-four (24) months <br />from the time of planting. <br />9. IRON MONUMENTS. In accordance with Minnesota Statutes § 505.021 and <br />Arden Hills City Code Section 1140.01, the final placement of iron monuments for all lot corners <br />shall be verified upon the completion of work before the applicable security is released. The <br />Developer's surveyor shall also submit a written notice to the City certifying that the monuments <br />have been located or reinstalled if they were disturbed during construction. <br />10. PERMITS. The Developer shall obtain or require its contractors and <br />subcontractors to obtain, prior to any site activities, all necessary permits, including but not limited <br />to the following to the extent required: <br />• Rice Creek Watershed District <br />• City of Arden Hills for Building Permits <br />• City of Arden Hills Grading and Erosion Control Permit (Escrow will be <br />determined at the time of application) <br />• City of Arden Hills Right -of -Way Permit (Escrow will be determined at the <br />time of application) <br />11. LICENSE. The Developer hereby grants the City, its agents, employees, officers <br />and contractors a license to enter the property to perform all work and inspections deemed <br />appropriate by the City in conjunction with the Development. <br />f <br />
The URL can be used to link to this page
Your browser does not support the video tag.