My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
09-23-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2024 4:19:32 PM
Creation date
10/25/2024 4:12:57 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HRGreen® <br />July 12, 2024 <br />David Swearingen, P.E. <br />Public Works Director/City Engineer <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112-5743 <br />Attachment A <br />► 255 <br />St. Paul, MN 55114 <br />Main 651.644.4389 + Fax 713.965.0044 <br />►HRGREEN.COM <br />Re: Arden Manor Park and Floral Park Improvements Application for Payment #2 <br />Dear David, <br />In accordance with the Contract Documents, based on on -site observations and the data comprising this <br />Application for Payment, the Engineer certifies to the Owner that to the best of the Engineer's knowledge, <br />information, and belief the Work has progressed as indicated, the quality of the Work is in accordance with the <br />Contract Documents, and Peterson Companies, Inc. is entitled to payment of the AMOUNT DUE THIS <br />APPLICATION for Application for Payment #2 and HR Green recommends approval of payment. <br />Peterson Companies, Inc. has completed all project work and punchlist items and it is the understanding of the <br />Engineer that Application for Payment #2 is their final Application for Payment for this project with the exception of <br />an Application for Payment solely for release of Retainage. <br />The following is a summary of bid items that ended with quantities different than the bid quantities or Change <br />Order 01 quantities and contributed to the amount completed being different than the current contract price: <br />- Arden Manor Park: <br />o Item 13 Common Embankment (CV): Overrun of 107 CU YD and $736.16 (see Change Order 01 <br />that removed hard court improvements). Earthwork -related quantity changes related to Change <br />Order 01 were proposed by the Contractor, reviewed by the Engineer, and discussed with the <br />Contractor, and it was determined that this quantity adjustment was within reason. <br />o Item 14 Excavation — Common: Overrun of 6 CU YD and $74.64 (see Change Order 01 that <br />removed hard court improvements). Earthwork -related quantity changes related to Change Order <br />01 were proposed by the Contractor, reviewed by the Engineer, and discussed with the <br />Contractor, and it was determined that this quantity adjustment was within reason. <br />o Item 16 Geotextile Fabric Type 5: Overrun of 516 SQ YD and $1,816.32 (see Change Order 01 <br />that removed hard court improvements). The original quantity (before Change Order 01) of 595 <br />SQ YD inadvertently did not include the 516 SQ YD of geotextile fabric beneath the courts. With <br />Change Order 01, the original quantity was reduced by the area of the geotextile fabric beneath <br />the courts, but the original quantity of 595 SQ YD is warranted. <br />o Item 18 Type SP 9.5 Wearing Course Mix (2,C): Overrun of 6 TON and $831.60. Contractor <br />provided quantity backup in the form of asphalt paving subcontractor invoice showing quantity, <br />which matches the total quantity of the load tickets tracked. Quantity required was greater than <br />estimated during design. <br />o Item 24 4" Concrete Walk: Overrun of 206 SQ FT and $2704.78. Original quantity was for bike <br />rack pad only. Additional quantity for bench pad (18 SQ FT) not included with original design and <br />HR Green' I Building Communities. Improving Lives. <br />
The URL can be used to link to this page
Your browser does not support the video tag.