My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-17-2024 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2024
>
12-17-2024 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 12:13:04 PM
Creation date
12/11/2024 12:10:05 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6- <br />I . Topographic survey <br />2 . Topographic plan <br />3. Topographic final plan <br />4 . Grading plan <br />It was estimated that 14 acres would be the area needed <br />for 2 baseball diamonds . <br />February <br />Herbert McIntosh made a motion , seconded by Jacqueline <br />Spratt , to hire Mark Hurd to take aerial photographs of the Perry <br />Park site as soon as the snow is gone . Mr. Herrick will report <br />back to this Committee concerning arrangements ; motion carried <br />unanimously. <br />March <br />It was reported that Bannister Engineering will be doing <br />a topographical map of Perry Park very soon . <br />It was reported that Jackie Spratt had contacted a <br />contractor in regard to landfill that might be available for <br />Charles Perry Park. It was decided that the kind of fill was un- <br />desirable so should not be used . <br />Mr. Herrick reported that Banister Engineering Company <br />will begin surveying Perry property when the snow cover is gone . <br />May <br />It was reported that Schuty Construction Company has <br />contracted to provide 10, 000 yards of landfill for the Perry Park <br />ball diamond . Schuty has posted the $5 ,000. 00 bond on himself <br />which is required by Village ordinance . He will keep the area <br />411 fenced to prevent unauthorized dumping . There will be a machine
The URL can be used to link to this page
Your browser does not support the video tag.