My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-17-2024 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2024
>
12-17-2024 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 12:13:04 PM
Creation date
12/11/2024 12:10:05 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10- . <br />and modifications of that plan by conversation on November 2 , <br />411 <br />1970 , narrowing the road fifteen feet to enlarge the field area . <br />In November , the Engineer told Mr . Beggin that with the shallow <br />grassy ditch along right field line and sand mixed with black <br />dirt for the field ' s top soil , very adequate drainage would be <br />accomplished . The Banister estimates as of that November 2 <br />conversation for the large field totaled $4 , 616. 00 , $ 1 ,004 . 00 <br />in addition would be needed for development of that field plus <br />the multiple use field across the roadway ( that area to include <br />two softball fields convertible to one football or one soccer <br />field ) . These estimates include bulldozing , seeding the outfield , <br />sodding the infield and one backstop . Sodding the large out- <br />field would be an additional $548 ( sod-delivered-only price ) . <br />Ten foot II -gauge fencing would be an additional $5 ,000 . 00 . The <br />estimate does not include top soil mix , water facilities , <br />roadway or parking lot surfaces . <br />The Committee felt the estimates too low to be rea- <br />listic. They also expressed a very strong interest in building <br />a sprinkling system at the time of construction . If toilets are <br />eventually to be built within the park, then these pipes ought <br />to be laid at the same time . After suggestion by F . Bear , it was <br />agreed that Banister Engineering ought to be asked about <br />estimates for water service to future toilet facilities , the <br />feasibility of using plastic pipes for the main line and/or <br />sprinkling systems to both areas of grass . <br />If the park is to be used this summer , it will be <br />necessary to get firm estimates on grading , seed and/or sod , top-
The URL can be used to link to this page
Your browser does not support the video tag.