My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-17-2024 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2024
>
12-17-2024 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 12:13:04 PM
Creation date
12/11/2024 12:10:05 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
soil and backstop and ask the Council to proceed with the bids . <br />411 If the fill job is judged adequate after the spring thaw , work <br />could proceed in May . <br />Larry Brodie said impacting tests could probably be <br />run about the time road restrictions come off - end of April or <br />beginning of May . <br />Costs , heights , and reasons for fencing were also dis- <br />cussed . The Banister estimate of $5 , 000. 00 was discussed . This <br />would probably be more than adequate for several sides , but in <br />the event of homes on the northwest side , the ten-foot fence <br />would help keep balls inside the park . It was mentioned that <br />without any fencing , some fields have been badly damaged by mo- <br />torized vehicles . However , unlike the sprinkling system , this <br />could be postponed without increasing the cost of installation . <br />Perry Park cost estimates were discussed and priorities <br />were set on steps for proceeding as follows : <br />bulldozer 864 . 00 <br />black dirt 10.1600 . 00 <br />water main 3 , 600 . 00 <br />3 back steps 3 , 194 . 00 <br />sodding ( del . only ) 4 , 361 . 00 <br />sprinkling system 11 , 000 . 00 <br />infield mix 2 , 565 . 00 <br />road and parking lot <br />paving 4 , 650. 00 <br />fence 4 , 400 . 00 <br />45 , 234 . 00 45 , 234 . 00 <br />sewer 3 , 900 . 00 <br />toilet facilities 10 , 000. 00 <br />added storage 300. 00 <br />dug outs 2 , 300 . 00 <br />16 , 500. 00 16 , 500. 00 <br />Total $61 , 734 . 00 <br />It is hoped that steps through the fencing will be <br />410 <br />completed this year.
The URL can be used to link to this page
Your browser does not support the video tag.