Laserfiche WebLink
soil and backstop and ask the Council to proceed with the bids . <br />411 If the fill job is judged adequate after the spring thaw , work <br />could proceed in May . <br />Larry Brodie said impacting tests could probably be <br />run about the time road restrictions come off - end of April or <br />beginning of May . <br />Costs , heights , and reasons for fencing were also dis- <br />cussed . The Banister estimate of $5 , 000. 00 was discussed . This <br />would probably be more than adequate for several sides , but in <br />the event of homes on the northwest side , the ten-foot fence <br />would help keep balls inside the park . It was mentioned that <br />without any fencing , some fields have been badly damaged by mo- <br />torized vehicles . However , unlike the sprinkling system , this <br />could be postponed without increasing the cost of installation . <br />Perry Park cost estimates were discussed and priorities <br />were set on steps for proceeding as follows : <br />bulldozer 864 . 00 <br />black dirt 10.1600 . 00 <br />water main 3 , 600 . 00 <br />3 back steps 3 , 194 . 00 <br />sodding ( del . only ) 4 , 361 . 00 <br />sprinkling system 11 , 000 . 00 <br />infield mix 2 , 565 . 00 <br />road and parking lot <br />paving 4 , 650. 00 <br />fence 4 , 400 . 00 <br />45 , 234 . 00 45 , 234 . 00 <br />sewer 3 , 900 . 00 <br />toilet facilities 10 , 000. 00 <br />added storage 300. 00 <br />dug outs 2 , 300 . 00 <br />16 , 500. 00 16 , 500. 00 <br />Total $61 , 734 . 00 <br />It is hoped that steps through the fencing will be <br />410 <br />completed this year.