My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-17-2024 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2024
>
12-17-2024 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 12:13:04 PM
Creation date
12/11/2024 12:10:05 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5- <br />1973 <br />Parks and Recreation Committee Minutes : April <br />Lindquist and Buckley explained to the Committee the <br />latest plans for handling the moisture problem at Valentine <br />Park. It is their hope that the open ditch method will be suc- <br />cessful in removing the water. <br />May <br />Valentine Park drainage was discussed . Johansen , <br />Boss , Buckley and Lund to consult Professor Phil Manson , an <br />agricultural drainage specialist at the University of Minnesota , <br />by meeting at the site to study the problem and come up with <br />a solution . (Manson indicated that the drains from the upper <br />streets should be unplugged and a ditch for drain water be <br />dug along the south side of the field , then north to the <br />drain into Valentine Lake . Mr . Buckley got the job done . <br />Alternate plan if this didn ' t work was to lay drainage tile . <br />This was not necessary . <br />June <br />Five additional loads of infield material was placed <br />1 <br />and leveled at Valentine Park and the baseball diamond is <br />being used for the first time in two years . <br />September <br />Site improvement : J . Buckley reviewed this summer ' s <br />site improvement projects . After clarification , G. Beagin <br />moved that the following projects be completed at Valentine <br />Park : <br />Underground wire be laid to new shelter and location : <br />Cost approximately $225 . 00
The URL can be used to link to this page
Your browser does not support the video tag.