My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-17-2024 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2024
>
12-17-2024 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 12:13:04 PM
Creation date
12/11/2024 12:10:05 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pane 2 <br />F , CLEAN LP <br />Upon completion of the project and before acceptance is <br />grade , Arden N'anor Contractor shall remove from the project <br />all surplus and discarded materials , equipment , rubbish and <br />temporary structures , and shall leave the project in a neat <br />and presentable condition throughout the entire area of the <br />project . <br />II . Tennis Court Ease <br />The base for the tennis court shall consist of a 31 ' bituminous <br />base course ( Spec . 2331 ) and an I }" bituminous wearing course <br />Spec . 2341 ) . <br />A . EASE COURSE <br />The plant mixed bituminous base course shall be constructed <br />in accordance with the provisions of Specification 2331 . The <br />bituminous material shall be AC- I , 85- 100 penetration . The <br />percent of bituminous material by weight in the mixture shall <br />be 4 . u ; to 5 . 0 . It shall be constructed to a depth as shown <br />in the typical section and as illustrated on the typical <br />detail sheet . Spreadinn shall be done with ravers in accordance <br />with the provisions of Specification 2331 . The bituminous <br />base material l shall l be constructed directly on the prepared• <br />subnrade and compacted in accordance with Specification 2331 . <br />E. WEARING COLPSE <br />The plant mixed bituminous wearing course shall be constructed <br />in accordance with the provisions of Specification 2341 . The <br />titumincus material shall be AC- I , 85- 100 penetration . The <br />percent of bituminous material by weight in the mixture shall <br />be 6 . CN to 7 . 0% . It shall be constructed to a depth as shown <br />in the typical section and as illustrated on the typical detail <br />sheet . Spreading shall be done with pavers in accordance with <br />the provisions of Specification 2331 . The bituminous wearing_ <br />course shall be constructed directly on the base course and <br />connected in accordance with Specification 2331 . <br />Note : Following the construction of the wearing course surface <br />variation shall not exceed k" in 10 feet in any direction . <br />The finished surface shall be smooth , free from ridges , valleys <br />and tool marks . <br />FLAYING LINES <br />Forty-eight hours minimur after completion of the surfacing , <br />2- inch wide playing lines shall be accurately located , marked <br />and painted with Laykold Line Paint.
The URL can be used to link to this page
Your browser does not support the video tag.