My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-16-24-SR
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
12-16-24-SR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 2:38:45 PM
Creation date
12/17/2024 2:33:58 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Minnesota Roofing Company is not responsible for any existing gutter(s), gutter helmets/screens and/or downspout damages that may occur or <br />any other special gutter cover you may have on your gutters. It is up to the customer to have the company that installed them to remove them <br />before the roofing takes place to keep the warranty valid. <br />- Minnesota Roofing Company is not responsible for any additional HVAC, plumbing, electrical, Masonry and/or carpenter work/project(s) they may <br />need to take place during the project. If additional work is required we can facilitate the work to be performed. Any/all steps that need to take place <br />will be communicated with owner before proceeding. This will result in a change in the total project(s) price and a signed change order must be <br />submitted in order to move forward. <br />Payments as follows: <br />1/3 Down -Payment <br />1/3 Mid -Way <br />Remaining balance to be paid in full upon completion/invoice. <br />$40,850.00 <br />Shingle Roofing Section <br />IKO Dynasty Limited Lifetime Shingles. <br />Minnesota Roofing Company to do the following <br />1. Remove existing shingles down to deck. <br />2. Re -nail any loose wood. If bad, rotten or un-nailable surface is discovered, it will be replaced at a price of $150 per sheet (per approval along with <br />a signed change order from homeowner). <br />3. Install 6' of Ice and water shield, to meet code, at all gutter lines, valleys, wall lines, and around all chimneys. <br />4. Install Rhino synthetic underlayment to the balance of the roof. <br />5. Install IKO starter strip shingles along all gutter lines, rake edges, and valleys. <br />6. Install IKO Limited Lifetime dimensional shingles per specifications (using 1 1/4" roofing nails). <br />7. Install IKO for the hip & ridge. <br />8. Install new ridge vents. <br />9. Install new plumbing flashing, bathroom vents, and kitchen vents. <br />10. Install all new drip edge and gutter apron. <br />11. Remove and replace any/all metals if necessary (will communicate any/all replacements before proceeding). <br />12. Remove and replace any/all damaged/compromised materials if necessary (will communicate any/all replacements before proceeding per a <br />signed change order from the customer. All pricing will be above and beyond the original contract. <br />13. All work will be preformed to meet the specs of the engineer and city requirements. <br />Note: The price below reflects the steps, materials and man hours necessary to complete this project. Minnesota Roofing Company abides by city <br />code/laws. Inspections are necessary before, during and after the project(s) by the city to approve project processes. If additional steps, materials <br />and/or man hours are needed; the price below may increase to meet necessary pricing. <br />Note: There may be more issues to the roof's structure/condition that are not yet known. Due to this fact, there may be a price increase to this <br />estimate for additional materials, labor, fees etc. <br />Note: There may be a need for decking replacement on sections of structure(s) or on entire structure(s) due to damaged/compromised material(s) <br />and/or to meet current code/law requirements. Replacement is $150/sheet and $15/linear ft. This step will be communicated and discussed before <br />moving forward. <br />- Any/all added change orders will add to the total price of the job(s). Any/all added change orders will be communicated and discussed with before <br />moving forward. Our crews may come across unforeseen obstacles and encounters with materials that may add to the job(s) and the total price of <br />the job(s). This may also delay the completion date for the job(s). <br />- Per city ordinances for construction start time, our start time is 7:OOam. Any/all additional costs and lost production incurred due to delayed start <br />time requests will be charged on a change order basis at a rate of $100/lost man hour in addition to the base contract price unless otherwise <br />agreed. <br />- Minnesota Roofing Company will honor the price for a period of 30 days from the submitted date. <br />Minnesota Roofing Company to offer a lifetime manufacturer's warranty and a 10-year workmanship warranty on the roofing <br />- Minnesota Roofing Company to perform project(s) with/on insurance assistance/proceeds. If insurance is involved, please supply necessary <br />documentation and contact for Minnesota Roofing Company's assistance in the supplementing process. <br />-Our crews are licensed and insured. <br />-Crews will maintain safety requirements at all times during the construction process. <br />-Crews clean all job -related debris. <br />*The price below reflects a cash price. <br />*Price includes all labor, material, equipment, dumpster, and permits. <br />*All promotions and discounts are applied. <br />*If any woodwork is needed, a change order will need to be approved and signed. <br />*This estimate is based on one layer of roofing. <br />*If additional layers of shingles are discovered, a change order will need to be approved and signed. <br />- Minnesota Roofing Company is not responsible for any existing gutter(s), gutter helmets/screens and/or downspout damages that may occur or <br />any other special gutter cover you may have on your gutters. It is up to the customer to have the company that installed them to remove them <br />h..f..... +k.......C.... +.. I..... -I--- +.. I....... +L..............+., „- N.J <br />
The URL can be used to link to this page
Your browser does not support the video tag.