Laserfiche WebLink
Attachment A <br />MNRoofing Company Shingle & 29ga Steel <br />1071 County Hwy 10 Ste # Roof Estimate <br />230 <br />Spring Lake Park, MN 11/13/2024 <br />55432 <br />License # BC688547 <br />Phone: (612) 888-7663 <br />Company Representative <br />Andy Kretschmar <br />Phone: (320) 360-2299 <br />andy@mnroofingco.com <br />Jeff Frid <br />City of Arden Hills <br />1219 Cummings Park Drive <br />Arden Hills, MN 55112 <br />(651) 755-1461 <br />Steel Roofing Section <br />Minnesota Roofing Company to do the following: <br />1. Remove existing materials down to the decking/base of roof. <br />2. Re-nail/screw any loose wood/metal. If bad, rotten or un-nailable surface is discovered, it will be replaced at a price of $150 per sheet (per <br />approval along with a signed change order from homeowner). <br />3. Install High Temp synthetic underlayment to the balance of the roof. <br />4. Install Central States Starter along all gutter lines, rake edges, and valleys. <br />5. Install Central States Steel Roofing System with style, color and gauge of your choosing. <br />6. Install Central States for the Hip & Ridge. <br />7. Install new metal ridge vents. <br />8. Install new plumbing flashing as needed. <br />9. Remove and replace any/all metals if necessary (will communicate any/all replacements before proceeding). <br />10. Remove and replace any/all damaged/compromised materials if necessary (will communicate any/all replacements before proceeding per a <br />signed change order from the customer. All pricing will be above and beyond the original contract. <br />11. All work will be preformed to meet the specs of the engineer and city requirements. <br />Note: The price below reflects the steps, materials and man hours necessary to complete this project. Minnesota Roofing Company abides by city <br />code/laws. Inspections are necessary before, during and after the project(s) by the city to approve project processes. If additional steps, materials <br />and/or man hours are needed; the price below may increase to meet necessary pricing. <br />Note: There may be more issues to the roof's structure/condition that are not yet known. Due to this fact, there may be a price increase to this <br />estimate for additional materials, labor, fees etc. <br />Note: There may be a need for decking replacement on sections of structure(s) or on entire structure(s) due to damaged/compromised material(s) <br />and/or to meet current code/law requirements. Replacement is $150/sheet and $15/linear ft. This step will be communicated and discussed before <br />moving forward. <br />- Any/all added change orders will add to the total price of the job(s). Any/all added change orders will be communicated and discussed with before <br />moving forward. Our crews may come across unforeseen obstacles and encounters with materials that may add to the job(s) and the total price of <br />the job(s). This may also delay the completion date for the job(s). <br />- Per city ordinances for construction start time, our start time is 7:00am. Any/all additional costs and lost production incurred due to delayed start <br />time requests will be charged on a change order basis at a rate of $100/lost man hour in addition to the base contract price unless otherwise <br />agreed. <br />- Minnesota Roofing Company will honor the price for a period of 30 days from the submitted date. <br />Minnesota Roofing Company to offer a 20-year manufacturer's warranty and a 10-year workmanship warranty on the roofing. <br />Minnesota Roofing Company to perform project(s) with/on insurance assistance/proceeds. If insurance is involved, please supply necessary <br />documentation and contact for Minnesota Roofing Company's assistance in the supplementing process. <br />-Our crews are licensed and insured. <br />-Crews will maintain safety requirements at all times during the construction process. <br />-Crews clean all job -related debris. <br />*The price below reflects a cash price <br />*Price includes all labor, material, equipment, dumpster, and permits. <br />*All promotions and discounts are applied. <br />*If any woodwork is needed, a change order will need to be approved and signed. <br />*This estimate is based on one laver of roofing. <br />