My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
01-13-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 1:47:26 PM
Creation date
1/14/2025 1:28:42 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 18 of 20 <br /> <br />Pedestrian and Bicycle Circulation Provide circulation plan and bike <br />rack <br />Bicycle parking provided for <br />residents <br /> <br />Additional Review <br /> <br />Building Official <br />The Building Official has reviewed the plans and has no additional comments at this time. A <br />Building Permit will be required prior to any construction taking place. <br /> <br />Public Works Director/City Engineer <br />The Public Works Director/City Engineer has reviewed the plans. A memorandum has been <br />prepared by the Public Works Director/City Engineer and included as Attachment M. <br /> <br />Fire Marshal <br />The Fire Marshal is currently reviewing the plans. No additional conditions have been included at <br />this time <br /> <br />Ramsey County <br />Ramsey County has reviewed the plans and submitted a statement submitted December 3, 2024, <br />that addresses traffic/access, programming, and permitting. Comments included: <br />• County Road 96 and church access intersection is anticipated be signalized as part of the <br />Rice Creek Commons development, this development should present minimal issues to <br />the county’s roadway system <br />• Development access intersection with CSAH 96 will be shared with access to the Rice <br />Creek Commons site to the north. If construction will take place simultaneously, <br />coordination between contractors will be required. <br /> <br />Minnesota Department of Transportation <br />MnDOT has reviewed the plans and submitted a letter dated November 27, 2024, that addresses <br />noise, surveys, and required permits. The letter is included as Attachment N. <br /> <br />United States Fish and Wildlife Service <br />FWL did not provide comments at the time of writing this report. <br /> <br />Minnesota Department of Natural Resources <br />The Area Hydrologist stated that the plans appear to be consistent with the requirements, including <br />those for open space and density, in Minnesota rules for residential PUDs in shoreland. <br /> <br />Planning Commission Review <br /> <br />The Planning Commission reviewed this application at the December 4, 2024 meeting. The <br />Commission discussed the discretion the City has in reviewing the application, the park dedication <br />fees, traffic controls, the lack of affordable housing in the proposal, the density of the proposal, <br />landscaping and tree management, access to the site, and internal circulation of traffic. <br /> <br />The Commission voted 5-2 to recommend denial of Planning Case 24-018 with the following <br />findings: <br />
The URL can be used to link to this page
Your browser does not support the video tag.