My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-03-2025 Special JDA Work Session Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2025
>
02-03-2025 Special JDA Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2025 8:19:40 AM
Creation date
2/3/2025 8:19:29 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page | 9 <br /> <br />Energy Efficient Design/Operations and Electrification Worksheet <br />At design development review, submit this worksheet, energy model report, and mechanical plans <br />documenting all-electric systems and district energy connection. Re-submit if changes are made. <br />Per Guideline 2.2.1, all buildings and tenant improvements shall provide an energy model report showing <br />achievement of 50% better energy efficiency than the applicable Minnesota Energy Code. <br /> <br />☐ Design Development Submittal ☐ Final Design Submittal ☐ Close-out Submittal <br />Industrial/Commercial/Multifamily Buildings <br />What is the building area (GSF)? <br />What code baseline is being used? (e.g., ASHRAE 90.1-2022) <br />Metric Code Baseline Proposed Design <br />Energy Use Intensity (kBtu/sf-year) <br />Percent better efficiency of proposed <br />design compared to code baseline EUI <br />Electric energy use (kWh) <br />Other fuel use (MMBtu) 1 <br />Please specify: <br />[Optional] Unregulated process loads <br />(kBtu/sf-year) 2 <br />1 Use of fossil fuels may only be incorporated with written consent through the waiver process. If granted, <br />submit documentation showing offset of an equivalent amount of carbon emissions from offsite sources. <br />2 In addition to providing their total energy use, projects that would like to be evaluated based only on the <br />energy loads that are regulated in ASHRAE 90.1 may provide a separate estimate of their unregulated process <br />loads. <br />
The URL can be used to link to this page
Your browser does not support the video tag.