My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-03-2025 Special JDA Work Session Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Joint Development Authority (JDA)
>
JDA Agenda Packets
>
2025
>
02-03-2025 Special JDA Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2025 8:19:40 AM
Creation date
2/3/2025 8:19:29 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page | 10 <br /> <br />Renewable Energy Worksheet <br />At design development review, submit this worksheet, a roof plan showing PV system coverage (for <br />multifamily buildings), PV system specifications showing efficiency rating, and PV system sizing <br />documentation confirming guideline compliance. Re-submit if changes are made. <br />Per Guideline 2.2.3, all buildings shall include PV systems to generate on-site renewable energy. Refer to <br />the Guideline for detailed requirements. <br />☐ Design Development Submittal ☐ Final Design Submittal ☐ Close-out Submittal <br />Industrial/Commercial Buildings <br />PV system size (kW) <br />Predicted annual electricity generation (kWh) <br />Percentage of annual energy use generated by the PV system (120% required) <br />PV panel efficiency (%) <br />Owner of the renewable energy credits generated from the PV system <br /> <br />☐ Design Development Submittal ☐ Final Design Submittal ☐ Close-out Submittal <br />Multifamily Buildings <br />Building roof area (gsf) <br />Rooftop PV system size (kW) <br />Predicted annual electricity generation of the rooftop PV system (kWh) <br />Parking area PV system size (kW) <br />Predicted annual electricity generation of the parking area PV system (kWh) <br />If parking area is over 20 spaces, % covered by PV system (≥30% required) <br />PV panel efficiency (%) <br />Owner of the renewable energy credits generated from the PV system
The URL can be used to link to this page
Your browser does not support the video tag.