My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
03-10-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 10:19:19 AM
Creation date
3/17/2025 10:16:17 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This collective base map will be used as the basis and <br />background for final design. <br />The full field survey will include the following at select <br />locations identified below: <br />• Submit Gopher State One Call tickets for field <br />markings and maps along full topographic areas <br />identified below; field markings will be collected on <br />the ground via topographic survey <br />• Submit Gopher State One Call ticket for field markings <br />of all curb stops to be marked by city public works <br />staff; curb stop locations will be collected via <br />topographic survey and a file of the data will be <br />provided for the city’s implementation into their <br />citywide GIS system; city public works staff will <br />identify any curb stops in need of adjustment as part <br />of the project <br />• Establish project control based on Ramsey County <br />coordinate system, NAD 83 (2011 Adj.) with <br />elevations based on NAVD 88 <br />• Use county GIS parcel linework for right-of-way <br />and property lines; easements will be added in <br />an approximate manner based on available plat <br />information <br />• Collect field locations of existing conditions and <br />utilities <br />• Complete structure inventories on existing structures, <br />including rim and invert elevations <br />The full field survey will be completed at the following <br />locations: <br />• BMP 1 – Phase 2 at the southeast side of Karth Lake, <br />adjacent to Cummings Park <br />• Curb stops for each property adjacent to the proposed <br />street improvements <br />• Storm sewer structure replacement areas, which <br />includes capturing the structures upstream and <br />downstream from the subject structure and ground <br />shots over the identified storm corridor <br />• Collect location and rim elevations via GPS of all <br />structures, gate valves, etc. in the street pavement <br />(from curb to curb) of the street project areas to <br />ensure all structures are identified for adjustment as <br />part of the project <br />• Set control points near the five storm outlet locations <br />to Karth Lake for use in completing the bathymetric <br />surveys and for use in construction to verify designed <br />elevations are met <br />• The two pedestrian ramp ADA improvement areas, <br />extending back approximately 100 feet for potential <br />trail/walk realignments <br />• All proposed trail rehabilitation areas <br />• The proposed retaining wall replacement and its <br />surrounding area for potential improvements <br />• The existing lake pump outlet system <br />• The watermain loop north of Karth Lake Drive, within <br />existing easements, along the south side of CR 96 for <br />potential relocation <br />The aerial survey will include the following efforts <br />in street rehabilitation areas and all other areas not <br />identified in the full field survey areas: <br />• County GIS parcel linework will be used for right-of- <br />way and property lines <br />• Easements will be added in an approximate manner <br />based on available plat information <br />• Submit Gopher State One Call tickets for maps; <br />utilities will be drawn in the base map in an <br />approximate manner based on provided mapping <br />• Existing curb lines will be depicted based on the aerial <br />photography and available record drawings <br />Bolton & Menk will also complete a bathymetric <br />assessment of the five delta locations in Karth Lake to <br />quantify the sediment to be removed in an approximate <br />100-foot radius around each outlet apron. The following <br />further describes the scope of work: <br />• Using a kayak, we will measure the depth to the top <br />of sediment, then push the blunt-ended grade rod to <br />the hard bottom and measure again; these depths <br />are recorded, along with a GPS waypoint, for digital <br />surface modeling <br /> ◦We will compare the measured hard bottom to <br />the original as-built and/or design information (if <br />available) and present to the city <br /> ◦If these elevations differ significantly, then a <br />verification check may be appropriate <br />9 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSWorK Plan and Project aPProach <br />EXHIBIT A
The URL can be used to link to this page
Your browser does not support the video tag.