My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
03-10-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 10:19:19 AM
Creation date
3/17/2025 10:16:17 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills <br />Proposal QTB210666 <br />February 21, 2025 <br />Page 5 <br /> <br />▪ Discussion identifying the subsurface conditions that will impact design and construction. <br /> <br />▪ Discussion regarding the reuse of on-site materials during construction. <br /> <br />▪ Recommendations for preparing structure and pavement subgrades, and the selection, <br />placement and compaction of fill. <br /> <br />▪ Recommendations for the use in design and construction of the street rehabilitation using an <br />assumed R-value, and associated utility improvements. <br /> <br />We will only submit an electronic copy of our report to you unless you request otherwise. At your <br />request, we can also send the report to additional project team members. <br /> <br />Environmental Scope of Services <br /> <br />Sediment Sampling <br />Our scope is generally based on the Minnesota Pollution Control Agency’s current best management <br />practice (MPCA BMP) document (MPCA, 2024). <br /> <br />The sampling is proposed to be completed in foot-accessible locations around Karth Lake, either through <br />the ice or wading into the lake at sufficiently shallow locations. Note that if ice conditions are not thick <br />enough (including if ice has not fully receded from the lake edge in warmer conditions) to conduct the <br />work safely, the work may need to be postponed until conditions allow the safe completion of the work. <br />Additional costs may be incurred if more than one mobilization is required due to unsafe conditions. <br /> <br />Per your request, and in accordance with MPCA BMPs, we will collect one analytical sample from each <br />location provided. The sample will be collected by driving a push probe sampler into the underlying <br />sediment using hand-driven probe sampling equipment. The sample will be comprised of composites <br />from the 0- to 5-foot interval (or shorter interval that is appropriate based on the sediment thickness) <br />from up to three sampling probe locations. <br /> <br />For each probe advanced, soil sample textures will be evaluated by visual methods as the samples are <br />collected and noted in the field notes. <br /> <br />Drilling tools will be cleaned prior to and between sampling runs by washing the equipment with a brush <br />and water containing Alconox® and rinsing the equipment with water. Where hand-driven probe <br />samplers are used, a clean liner will be used for sample collection for each sample. <br /> <br />The samples will be transferred to clean laboratory-supplied containers, preserved in accordance with <br />Braun Intertec Standard Operating Procedures (SOPs) and transported to a certified environmental <br />laboratory for analysis. Chain of Custody will be initiated at the time of sampling and maintained <br />throughout the process. <br />
The URL can be used to link to this page
Your browser does not support the video tag.