My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
03-10-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 10:19:19 AM
Creation date
3/17/2025 10:16:17 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills <br />Proposal QTB210666 <br />February 21, 2025 <br />Page 6 <br /> <br />Each of the sediment samples will be analyzed by the laboratory for the following baseline parameters as <br />listed in MPCA guidance: <br /> <br />▪ Metals – arsenic, cadmium, chromium III, chromium VI, copper, lead, mercury, nickel, <br />selenium, and zinc by SW-846 EPA 6010/7471B. <br /> <br />▪ Total phosphorus using method EPA 365.1. <br /> <br />▪ Nitrate & nitrite using EPA 353.2. <br /> <br />▪ Ammonia nitrogen using EPA 350.1. <br /> <br />▪ Total Kjeldahl nitrogen using EPA 351.2. <br /> <br />▪ Polychlorinated biphenyls (PCBs) using method SW-846 8082A. <br /> <br />▪ Total organic carbon using SW-846-9060. <br /> <br />▪ Extended List, Polycyclic Aromatic Hydrocarbons (PAHs) using EPA 8270E SIM. <br /> <br />For the purpose of this proposal, we assume 5 sediment samples will be submitted for chemical analysis. <br /> <br />Standard quality assurance/quality control (QA/QC) procedures will be used. The samples will be <br />analyzed within a turnaround time of approximately 10 working days. <br /> <br />Reporting <br />We will prepare a letter report describing our sampling goals, methodology, and results. Approximate <br />sampling locations will be plotted on aerial photographs. The laboratory data will be tabulated and the <br />tables provided to you along with the laboratory report(s). The MPCA dredge management levels for the <br />compounds will be included in the table and concentrations exceeding either of those values will be <br />highlighted. <br /> <br />Schedule <br /> <br />We anticipate performing our geotechnical and environmental work according to the following schedule. <br /> <br />▪ Drill rig mobilization – within 8 weeks following receipt of written authorization. <br /> <br />▪ Field exploration – 2 days on site to complete the soil borings and 2 days on site to complete <br />the pavement cores. <br /> <br />▪ Sediment sampling – 1 day on site to obtain the samples. <br /> <br />▪ Classification and laboratory testing – within 2 weeks after completion of field exploration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.