My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
03-10-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 10:19:19 AM
Creation date
3/17/2025 10:16:17 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />H:\ARDH\0T1131511\1_Corres\C_To Others\Letter of Recommendation\Letter of Recommendation - Contract Award 03.03.2025.docx <br /> <br />March 4, 2025 <br /> <br />Mr. David Swearingen <br />City of Arden Hills <br />1245 W Highway 96 <br />Arden Hills, MN 55112 <br /> <br />Re: Letter of Recommendation – Contract Award <br />Lift Station 5 Forcemain Replacement Project <br />City of Arden Hills, Minnesota <br />BMI Project No. 0T1.131511 <br /> <br />Dear Mr. Swearingen: <br /> <br />Bids were received on February 27, 2025 at 1:00 p.m. for the above referenced project. The results are <br />shown in the table below: <br /> <br /> BIDDERS TOTAL AMOUNT BID <br />1 New Look Contracting, Inc. $729,901.50 <br />2 G M Contracting, Inc. $740,753.36 <br />3 Minger Construction Co. Inc. $749,908.51 <br />4 Northdale Construction Company, Inc. $763,251.07 <br />5 Pember Companies, Inc. $878,554.50 <br />6 Meyer Contracting Inc. $898,418.54 <br />The engineer’s estimate was $890,000 <br /> <br />New Look Contracting, Inc. provided the low responsible bid with $729,901.50. The price appears to be <br />of good value as we received six bids and the low bid was favorable compared to the engineer’s <br />estimate. New Look Contracting has a good reputation for successfully completing public works <br />projects. We have reviewed the bid and investigated New Look Contracting’s ability to complete the <br />project. They are utilizing subcontractors for some key project elements including the trenchless <br />forcemain installation, and sewer bypassing. The identified trenchless pipe installer subcontractor for <br />this project has been identified as Subsurface Construction, Inc. They have successfully completed <br />several projects with similar characteristics. The sewer byassing is proposed to be completed by <br />Northern Dewatering who is an industry leader in this type of work. New Look Contracting is proposing <br />to complete a majority of the remaining work including the lift station modifications; they have <br />completed this type of work successfully in the past. From our research and industry understanding, <br />New Look Contracting and key subcontractors are all suitable and experienced at completing their <br />respective work scope. <br /> <br />Given that the price appears to be of good value and New Look Contracting and their subcontractor(s) <br />appear to be experienced and qualified to complete the work, we recommend that the City of Arden
The URL can be used to link to this page
Your browser does not support the video tag.