My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
03-10-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 10:19:19 AM
Creation date
3/17/2025 10:16:17 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br />Budget Impact <br /> <br />New Look Contracting, Inc. provided the low responsible bid with $729,901.50. The price <br />appears to be of good value as six bids were received, and the low bid was favorable compared <br />to the engineer’s estimate which was $886,562. <br /> <br />Total As-Bid Costs: <br />Construction (Primary) $ 729,901.50 <br />Pumps & Valves (estimate) $ 130,000.00 <br />Engineering Design $ 79,636.00 <br />Construction Mgmt. $ 41,448.00 <br />Materials Testing $ 10,582.00 <br />TOTAL $ 991,567.50 <br /> <br />Total Estimated Funding <br /> Sanitary Sewer Utility Fund $ 1,040,000 <br /> TOTAL $ 1,040,000 <br /> <br />The 2025-2029 CIP Budget includes funding in the amount of $1,040,000 for the proposed work. <br />Staff has reviewed the bid prices and recommends that the City proceed with the work. <br />Attachments <br /> <br />Attachment A: Bolton & Menk letter of recommendation and Bid Tabulation <br />Attachment B: Resolution 2025-027 <br />Attachment C: Contract with New Look Contracting, Inc. <br />Attachment D: Proposal from Braun Intertec <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.