Laserfiche WebLink
Page 2 of 2 <br /> <br />Budget Impact <br /> <br />New Look Contracting, Inc. provided the low responsible bid with $729,901.50. The price <br />appears to be of good value as six bids were received, and the low bid was favorable compared <br />to the engineer’s estimate which was $886,562. <br /> <br />Total As-Bid Costs: <br />Construction (Primary) $ 729,901.50 <br />Pumps & Valves (estimate) $ 130,000.00 <br />Engineering Design $ 79,636.00 <br />Construction Mgmt. $ 41,448.00 <br />Materials Testing $ 10,582.00 <br />TOTAL $ 991,567.50 <br /> <br />Total Estimated Funding <br /> Sanitary Sewer Utility Fund $ 1,040,000 <br /> TOTAL $ 1,040,000 <br /> <br />The 2025-2029 CIP Budget includes funding in the amount of $1,040,000 for the proposed work. <br />Staff has reviewed the bid prices and recommends that the City proceed with the work. <br />Attachments <br /> <br />Attachment A: Bolton & Menk letter of recommendation and Bid Tabulation <br />Attachment B: Resolution 2025-027 <br />Attachment C: Contract with New Look Contracting, Inc. <br />Attachment D: Proposal from Braun Intertec <br /> <br /> <br />