My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
03-10-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 10:19:19 AM
Creation date
3/17/2025 10:16:17 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Lift Station 5 Forcemain Replacement AGREEMENT <br />City Project PW-0102 1 of 5 <br />AGREEMENT BETWEEN OWNER AND CONTRACTOR <br />FOR CONSTRUCTION CONTRACT <br /> <br /> <br />THIS AGREEMENT is made this 10th day of March, 2025 (hereinafter “Effective Date of the Contract”) by <br />and between the City of Arden Hills, Ramsey County, Minnesota (hereinafter “Owner”) and New Look <br />Contracting, Inc. (hereinafter “Contractor”). The Owner and Contractor hereby agree as follows: <br /> <br />ARTICLE 1 – THE WORK AND THE PROJECT <br />1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work <br />is generally described as follows: Construction of a sanitary sewer forcemain replacement, <br />abandonment of the existing sanitary sewer forcemain, improvements to a sanitary lift station, and <br />appurtenant work. <br />1.02 The Project, of which the Work under the Contract Documents is a part is generally described as <br />follows: Lift Station 5 Forcemain Replacement, City Project No. PW-0102. <br /> <br />ARTICLE 2 – CONTRACT DOCUMENTS <br />1.01 The Contract Documents consist of the following: <br />A. This Agreement <br />B. Performance and Payment Bonds <br />C. Insurance Certificates <br />D. Instructions to Bidders <br />E. General Conditions <br />F. Supplementary Conditions <br />G. Division 1 – General Requirements <br />H. Division 2 – Special Provisions <br />I. Drawings (not attached by incorporated by reference) consisting of 21 sheets with each <br />sheet bearing the following general title: ARDEN HILLS FORCEMAIN REHAB PROJECT, <br />dated February 10, 2025. <br />J. Addenda (Numbers _ and _ inclusive) <br />K. Exhibits to the Agreement <br />1. Contractor’s Bid (pages _ to _ inclusive) <br />2. Non-Collusion Affidavit <br />3. Responsible Contractor Verification and Certification of Compliance Form <br />L. The following which may be delivered or issued on or after the Effective Date of the <br />Contract and are not attached hereto: <br />1. Notice to Proceed <br />2. Work Change Directives <br />3. Change Orders <br />4. Field Orders <br />2.02 This instrument, together with the documents hereinabove mentioned, form the Agreement, and <br />they are as fully a part of the Agreement as if hereto attached or herein repeated. <br />2.03 The Contract Documents may only be amended, modified, or supplemented as provided in the <br />General Conditions and Supplemental Conditions. <br /> <br />ARTICLE 3 – CONTRACT TIMES <br />3.01 Contract Times: The Work will be substantially completed on or before October 17, 2025 and <br />completed and ready for final payment in accordance with Paragraph 15.06 of the General <br />Conditions on or before December 7, 2025 Substantial Completion Date shall be defined as the <br />completion of all items with the exception of final lift of bituminous pavement and pavement striping.
The URL can be used to link to this page
Your browser does not support the video tag.