My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
03-10-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 10:19:19 AM
Creation date
3/17/2025 10:16:17 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Braun Intertec Corporation <br />11001 Hampshire Avenue S <br />Minneapolis, MN 55438 <br />Phone: 952.995.2000 <br />Fax: 952.995.2020 <br />Web: braunintertec.com <br />AA/EOE <br />March 3, 2025 Proposal QTB211164 <br /> <br /> <br />Ryan Peterson, PE <br />Bolton & Menk, Inc. <br />10400 Viking Drive, Suite 100 <br />Eden Prairie, MN 55344 <br /> <br />Re: Proposal for Construction Testing Services <br /> Lift Station 5 Force Main Replacement <br /> Stowe Avenue to County Road E <br /> Arden Hills, Minnesota <br /> <br />Dear Mr. Peterson: <br /> <br />Braun Intertec Corporation is pleased to submit this proposal to provide construction testing services for <br />the Lift Station 5 Force main Replacement in Arden Hills, Minnesota. <br /> <br />Our Understanding of the Project <br /> <br />We understand this project will include the construction of the force main rehabilitation in Arden Hills, <br />Minnesota. We understand the utility work will include trenchless, horizontal directional drilling (HDD) <br />installation of force main replacement along the existing walking path between Stowe Avenue and <br />County Road E. It is our understanding the installation will include 5 HDD pits and restoration of adjacent <br />surface features. <br /> <br />Available Information <br /> <br />This proposal was prepared using the following documents and information. <br /> <br /> Project plans and specifications prepared by Bolton & Menk, Inc., dated February 10, 2025. <br /> A Geotechnical Evaluation Report prepared by Braun Intertec dated January 23, 2024. <br /> <br />Scope of Services <br /> <br />Services are performed under the direction of a licensed professional engineer, on a periodic basis, <br />depending on the construction schedule and when they are requested by the general contractor. After <br />reviewing available information, we understand our scope of services for the project will be limited to <br />the tasks defined below. <br /> <br />Soil Related Services <br /> Observe and evaluate the soils exposed in excavations to determine if the soils are similar to <br />those encountered with the geotechnical evaluation and suitable for support of fill or <br />pavements. Our engineer can provide consultation for conditions that appear to differ from <br />the geotechnical evaluation. <br /> <br /> Perform laboratory mechanical analyses (gradations) of prospective fill materials.
The URL can be used to link to this page
Your browser does not support the video tag.