My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
03-10-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 10:19:19 AM
Creation date
3/17/2025 10:16:17 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Client:Service Description:Work Site Address: <br />Stowe Avenue to County Road E <br />Arden Hills, MN 55112 <br />Bolton & Menk, Inc. <br />Ryan Peterson <br />Attn: Accounts Payable <br />1960 Premier Dr <br />Mankato, MN 56001 <br />(952) 448-8838 <br />Construction Materials Testing <br />Proposal Total:$10,582.00 <br />Description Quantity Units Unit Price Extension <br />Phase 1 Construction and Materials Testing <br />Activity 1.1 Soil Observations and Testing $6,710.00 <br />207 Compaction Testing 25.00 Hour 98.00 $2,450.00 <br />Work Activity Detail Qty Units Hrs/Unit Extension <br />HDD Pit Backfill 5.00 Trips 5.00 25.00 <br />1308 Nuclear moisture-density meter charge, per hour 25.00 Each 34.00 $850.00 <br />1318 Moisture Density Relationship (Standard), per sample 3.00 Each 208.00 $624.00 <br />1162 Sieve Analysis with No. 200 wash (ASTM C136 and C117)2.00 Each 164.00 $328.00 <br />209 Sample pick-up 2.00 Hour 104.00 $208.00 <br />1861 CMT Trip Charge 7.00 Each 50.00 $350.00 <br />126 Project Engineer 10.00 Hour 190.00 $1,900.00 <br />Activity 1.2 Concrete Observations and Testing $2,196.00 <br />261 Concrete Testing 6.00 Hour 98.00 $588.00 <br />Work Activity Detail Qty Units Hrs/Unit Extension <br />Curb & Gutter 2.00 Trips 3.00 6.00 <br />278 Concrete Cylinder Pick up 2.00 Hour 104.00 $208.00 <br />1364 Compressive strength of concrete cylinders (ASTM C 39),per <br />specimen <br />10.00 Each 42.00 $420.00 <br />Work Activity Detail Qty Units Hrs/Unit Extension <br />Curb & Gutter 2.00 Sets 5.00 10.00 <br />1861 CMT Trip Charge 4.00 Each 50.00 $200.00 <br />118 Staff Engineer 5.00 Hour 156.00 $780.00 <br />Activity 1.3 Engineering Review $1,676.00 <br />238 Project Assistant 4.00 Hour 96.00 $384.00 <br />125 Project Control Specialist 2.00 Hour 106.00 $212.00 <br />128 Senior Engineer 5.00 Hour 216.00 $1,080.00 <br />Phase 1 Total:$10,582.00 <br />Page 1 of 103/03/2025 09:22 AM <br />Project Proposal <br />QTB211164 <br />Lift Station 5 Forcemain Replacement
The URL can be used to link to this page
Your browser does not support the video tag.