My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 08-30-1999
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1999
>
CC 08-30-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:11:41 PM
Creation date
11/9/2006 2:39:10 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />ARDEN HILLS CITY COUNCIL - AUGUST 30, 1999 <br /> <br />6 <br /> <br />Ms. Randall explained that the petitioner was requesting approval of a site plan to allow for a 50 <br />foot by 57 foot biofilter to eliminate odor at the Friskies plant which is located at 4251 Femwood <br />Avenue. <br /> <br />The City of Arden Hills has received several complaints from neighbors regarding the odor from <br />the Friskies plant. The Staff investigated their complaints and found that they constituted a <br />nuisance as defined in the City Code. Friskies has evaluated their existing process and other <br />processes for eliminating odor emanating from the plant. <br /> <br />Currently, Friskies uses a system of chemicals that neutralize the odor. The problem with the <br />current system is, if they change the ingredients, the chemicals to neutralize the odor must also <br />be modified. <br /> <br />Friskies would like to install a biofilter system to neutralize the odors. The biofilter system <br />removes and oxidizes organic gasses from contaminated air by use of beds of wood chips. <br />Billions of indigenous microorganisms, inherent within the wood chips, convert the organic <br />compounds to carbon dioxide and water. These naturally occurring microorganisms consume the <br />offending compounds in a safe, moist, oxygen rich environment. <br /> <br />The new biofilter is proposed to be located to the rear side of the existing plant. The majority of <br />the structure will be underground, however, six feet on the east side and two feet on the west side <br />will be above ground, with a six-foot high chain link fence along the top of the structure. The <br />chain link fence is to protect people and animals from entering the biofilter. Staff recommended <br />the chain link fence be open, or earth tone slats be used. <br /> <br />The applicant was proposing to add trees to buffer from the City trail and residents. Statf <br />proposed the trees be placed at a 45 degree angle to each other, 12 feet apart. The Planning <br />Commission recommended this tree line be extended further to the south on the west side. <br /> <br />The proposed biotilter meets the height, Hoor area ratio, lot coverage, landscape lot area, and <br />setback requirements. <br /> <br />The applicant would like the ability to turn a light on for maintenance. The light would be <br />located on the northwest side of the biofilter, facing southeast. The lighting would meet the <br />Zoning Ordinance lighting standard and would only be used for maintenance purposes. There <br />currently is no lighting on the wcst side of the building. <br /> <br />Ms. Randall advised that the Planning Commission recommended approval of Planning Case <br />#99-13, Site Plan, to allow for the construction of a 50 foot by 57 foot Biofilter subject to the <br />following conditions: <br /> <br />1. <br /> <br />Rice Creek Watershed Approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.