Laserfiche WebLink
<br /> ARDEN HILLS CITY COUNCIL WORKSESSION - NOVEMBER 15, 1999 2 <br /> . <br /> Additional discussion items included the traffic volumes as they relate to continuing <br /> development in the Gateway Business District (GBD); the continued scheduling delays in <br /> completing the Arden Hills portion of the project; MnDOT's support of Option 3; residential <br /> home acquisition responsibilities; ramifications on the Cities of New Brighton and Mounds View <br /> with additional traffic loading on I-35W; potential funding of more global transportation issues <br /> being studied by the I-35W Corridor Coalition; and the future of the mobile home park. <br /> It was the consensus of the Council that Ramsey County should be able to pursue Segment Two <br /> of the Highway 96 Reconstruction Project and be able to proceed without further delay. <br /> After further discussion, the City Administrator was directed to schedule a meeting between staff <br /> and Jim Tolaas of Ramsey County, to present the City's ultimate preferred design concept and <br /> request that they come up with a way to meet that design, and ifthey are not able to do so, to <br /> inform them that the Council wanted the road rebuilt "as is" with a signalized intersection at <br /> Highway 96 and 10 with no grade separation. <br /> 2000 Street Improvement Proiect, Feasibilitv Report Revisions <br /> Mr. Brown distributed a bench handout showing proposed revisions to the draft Feasibility Study <br /> . for the 2000 Street Improvement Project, based on project costs for a 32-foot wide street, and the <br /> various funding sources. Mr. Brown projected a $45 per assessable foot revenue source. <br /> Issues discussed included the creation of the Ingerson ponds and other drainage issues for water <br /> quality and Rice Creek Watershed District funding considerations; projected budget revenue and <br /> expenditure estimates; and inflationary ramifications for waiting until fiscal year 200 I to make <br /> the proposed improvements. <br /> Mr. Post advised Councilmembers of the available balance in Flmd No. 409 (Non-Assessable <br /> Road Improvements), which could be accessed to provide funding for any shortfall experienced <br /> for fiscal year 2000 improvements. Mr. Post provided a history of the source of those funds, <br /> including previous Minnesota State Aid (MSAl construction reimbursement and Army Reserve <br /> utility access fees. <br /> It was the consensus of the Council that, at a minimum, ponding and utility work be completed <br /> in the year 2000, with additional work to follow, after determining a City policy for the width of <br /> collector streets. However, Councilmembers determined that this caused a two-year construction <br /> period for the residents to contend with. <br /> Following further discussion, stafl was directed to present the entire scope ofthe proposed 2000 <br /> Street Improvement project to residents at the public informational meeting tentatively scheduled <br /> for November 30, 1999 at 7 :00 p.m. at City Hall, showing the ponding and water quality <br /> enhancements and presuming a thirty-two foot (32') street width. <br /> . <br />