My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 12-23-1974
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1970-1979
>
1974
>
CC 12-23-1974
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:11:45 PM
Creation date
11/9/2006 2:58:59 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Minutes of Spocj~1 Council ~~eet i ng DE,cember 23, 1974 <br /> Page six <br /> A r d en 21.~L-....?.t3 l' U L!3!?J?~1 r t Engineel-ing and Sur- <br /> ~"r . and Mrs. Adams and Mr. Jim Parker, Advance <br /> vel;' i ng Company, presented a progress schedule for Arden Manor indica- <br /> ting compleTion dates for ;1 ha s e IV ( 162 lots) end phase V <38 lots). <br /> A ~j i tn plan, ndicating "i"heportlon of -I-he pa rk to which they propose <br /> to I~e locate the model mob ile homes sales area, was pr'esented to the <br /> C'iunc i i for approva I. <br /> t4r. Parker said )chey propose tc comp lete a II ~'ork eaf,t of Road C In <br /> 1975; a I I ,"ork west of Road C I n 1976. <br /> Crichton stated that, as he underSTands the recuest, AI-den ~1anor will <br /> . not be comp I e-'-ed I n 1974, as provided by the SFecial Use Permit <br /> ~Ih i ch was granted; therefore, an amended or ne.' Special Use Permit <br /> will be neces ~;,3 ry to enable completion of the Fark, as now scheduled. <br /> He said '+ is his understalding that a new or emended Special Use <br /> ' , <br /> Permit would include the park dedication prov I f.i on, now applicable <br /> for a II subdivision develooments. He sa i d i n this particular case <br /> he would assume that the V i I I age would requ ire I.and (Instead of a ca sh <br /> donation) because of the need for a neighborhood park in th I s a rea of <br /> The V i I I age - an approximately 4.8 to 6 acre park siTe., somewhere <br /> within th'd Ardsn Manor m-:'bile home park. <br /> I n d;scu~;sion of the par~ dedication matter, I t was noted by I~r . <br /> Parker that the area around the recreation building might be an area <br /> wh i ch c(',u I d be so dedicated; streets and utilities already i nsta II ed <br /> in the balance of the park would probably preclude these areas for <br /> par-k dedication. Mrs. Adams questioned hO~1 this dedication could be <br /> made i" rega rds to their mortgage committments; f inane I ng requires <br /> base figure of 200 un i -:"5. <br /> Cr i ch.ron noted that It Is custcmary for dellelorer to work with Parks <br /> and Recreation CommitTee re park dedication to determine proper <br /> loca.tion <lnd shape of park desired and/or need of land liS. cesh dona- <br /> ti or. etc. for Its recommendatlcns to the Counc i I . <br /> In discussion of the existing '"ater supp I y and its adequacy for 51 <br /> un its, Mr. Ada;ns and Ik. Pa r k e r said they Interd to meet with Engineer <br /> LIJ nd re 1'85tlng of the system ~'/hen "these additional <to units arB occu- <br /> peed. Mr. Pa r kE~~- said that for-;ner tests indiCated present srstem I s <br /> adequate -!-o SHive t~1 i s ntmi1ef~ cf units dnd morE:. <br /> Feyereisar: stated tha"r te sts \~0U I d have to aSSlre that water system <br /> will adequately ser.....e thE' ent-i re pack before he could approve a new or <br /> amended Sp"cia[ Use Pennlt. <br /> A f 'fer discussion, In which Adams I nd i cated that there is no way the <br /> project can be comp I e,'ed in I 97 [~, Counc i I refer.red The proposed reloca- <br /> tion of tho mob 11'3 home sa I es lot to "the Plannl'ng Commission for iTS <br /> cons i derai- i on and ,-econmenda1'lcns to the Counci I. <br /> Crich1'cn moved, seconded by vii ngert, hat Council approve a temporary <br /> extension of 'rhe present Spec I <' I Use Permit unt I I January 31. 1975, <br /> to a I low for c.:>nti nuance of construction of thE bu II cI i ng and for sub- <br /> . mission 01' aPr,1 icatlon for new or am-snoad Special Use Permit' which sha I I <br /> Include: <br /> a) phas~i1g :3,chedul e <br /> b' deci~ljon on I<ater supply <br /> c> mob i :e h~me sa IE's lot location <br /> d) park dedication <br /> ~'.1o'l- ion car"tied unc,n i mous I y. <br /> In discussion re reimblJ'-~'ement of Village engineering costs, Adams <br /> requested a i-1 Jle extension for payment of theSE> costs, and Counc i I <br /> approval of occupa;,cy of the 40 mob! Ie home unitst <br /> ~6- <br /> --..------ <br />
The URL can be used to link to this page
Your browser does not support the video tag.