Laserfiche WebLink
C-3 <br />TW185\1\1011577.v13 <br />at least two proposals from solar developers to explore the feasibility of installing a full <br />photovoltaic (PV) (“Full-PV”) system that maximizes the available roof area. In the event <br />that the cost to Developer and Tenant of a Full-PV system is cost-neutral, Developer will <br />install the Full-PV system. Any renewable energy credits (“RECs”) generated from the <br />Full-PV system, if installed, are not required to remain with the Development. <br />2.3 District Energy. [NOT APPLICABLE] <br />2.4 Embodied Carbon. Prior to issuance of the building permit for the tenant improvements to be <br />performed at the Building, Developer shall conduct, and provide to the JDA, a whole building <br />life-cycle assessment and achieve at least a 10% reduction in global warming potential, using <br />the calculation methods established in LEED BD+C: New Construction. <br />2.5 Electric Vehicle Infrastructure. The Development shall include infrastructure to support four <br />(4) Level 2 electric vehicle supply equipment (EVSE) chargers and four (4) EV-capable <br />spaces. <br />2.6 Reporting. Beginning one year after issuance of the Certificate of Occupancy for the <br />commercial building and annually thereafter, Developer or any future Owner shall report <br />monthly whole-building energy consumption, on-site energy generation, electrical demand, <br />and water use to Energy Star Portfolio Manager, or, upon notification by the JDA, the City or <br />the County, a successor program or entity. Owners shall provide other building data upon the <br />reasonable request of JDA. <br /> <br /> <br /> <br /> <br />