My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-12-25-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
05-12-25-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 3:54:33 PM
Creation date
5/8/2025 3:49:47 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment C <br />October 16, 2003 <br />Travis Germundson <br />Area Hydrologist <br />Minnesota Department of Natural Resources, Waters <br />1200 Warner Road <br />Box 37 <br />St. Paul, MN 55106-6793 <br />RE: Karth Lake Pumping Plan, Arden Hills, Minnesota <br />DNR Permit #2003-3078 <br />Dear Mr. Germundson, <br />Please find enclosed a pumping and maintenance plan for Karth Lake. <br />A permanent pumping station is proposed to control the lake elevation. Pumping shall be coordinated <br />with the DNR and will be dependent on the elevation of the lake and the season. <br />The pumping solution includes the construction of a concrete pump manhole on the south end of Karth <br />Lake in Cummings Park and connecting a 6" forcemain from the pump to the storm sewer system on <br />Fernwood Avenue. It is proposed that this will be an electrical sump pump mounted on a floating raft <br />with a built in fish screen, which could be manually operated when necessary. <br />The City of Arden Hills would coordinate with the DNR to determine appropriate minimum and <br />maximum levels for pumping based. on Lake Elevation and time of year. Pumping rates will not exceed <br />360 gpm (less than 1 cfs.) At 360 gpm it is anticipate that it will take 2-112 to 3 weeks to draw the Karth <br />Lake Down 2 feet (approximately 10 mgal.) <br />The city would base the commencement and conclusion of pumping on the following criteria: <br />1) Pumping will not commence if the Lake Level is 934 ft or lower <br />2) April through September pumping would commence when the lake level reaches 936 feet and <br />would be stopped once the Lake reaches an elevation of 934. <br />3) October and November pumping would commence when the lake level reaches 935 or higher <br />and would stop once the elevation reaches 934. <br />4) No pumping is anticipated during the months of December through March <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phone: (612) 370-0700 <br />Fax: (612) 370-1378 <br />
The URL can be used to link to this page
Your browser does not support the video tag.