Laserfiche WebLink
5) During pumping operations the Lake Level readings will be checked daily Base on a gage set <br />in the lake near the pumps. Lake Levels will be monitored on a weekly basis otherwise. <br />6) Pumping would not begin without prior notification to the DNL R and Rice Creek Watershed <br />District. <br />7) During pumping operation down stream waters and conveyances will be checked to ensure the <br />pumping operation is not causing adverse down stream effects. <br />The flow rates would be low enough that the impacts to the down stream system would be negligible. <br />Karth Lake is considered to have good water quality and no adverse impacts to the down stream waters <br />are anticipated as result of proposed pumping of Karth Lake. <br />I can be reached at (61.2) 373-6500 to answer any questions or to provide additional information. <br />Sincerely, <br />URS Corporation <br />Nick wer, P.E. <br />Civil Engineer <br />Enclosure <br />Cc; Michelle Wolfe, City Administrator, City of Arden Hills <br />Aaron Parrish, City Community Services Director, City of Arden Hills <br />Tom Moore, Operations and Maintenance Director, City of Arden Hills <br />Steve Hobbs, District Administrator, Rice Creek Watershed District <br />Greg Brown, URS <br />File: 37951-028-0101 <br />Thresher Square <br />700 Third ,Street South <br />Minneapolis, MN 55415 <br />Phone: (612) 370-0700 <br />Fax: (612) 370-1.378 <br />