My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
05-27-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2025 6:25:58 PM
Creation date
6/20/2025 6:21:48 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br /> <br />On April 30, 2025, the City of Arden hills was awarded the MnDOT SRTS Grant in the amount <br />of $1,000,000. <br /> <br />On May 12, 2025, at a Work Session the City Council gave direction to staff to request a <br />proposal for professional services from SRF. <br /> <br />The proposal (PSA Amendment No. 3) is provided as Attachment A in the amount not to exceed <br />$484,445.00. <br /> <br /> PSA Amendment No. 3 Scope of Services: <br />• Environmental Documentation <br />• Boardwalk & Retaining Wall Final Design <br />• Drainage Design & Permits <br />• Construction Administration <br />• Construction Observation <br />• Construction Staking <br />• Materials Sampling and Testing Coordination <br />• As-Builts <br />• Wetlands (Delineation/Permitting) <br />• Right-of-Way Acquisition Administration <br />• Project Management <br />• Utility Coordination <br />• Final Plans, Specification & Estimate <br />• Grant Management <br /> <br />Budget Impact <br /> <br />The Old Highway 10 Trail Improvements project is in the 2025-2029 CIP and tentatively <br />scheduled for 2026 construction, project funding would be derived from the City’s PIR-Parks <br />fund, Municipal State Aid (MSA), Ramsey County cost-share and grant funding. <br /> <br />Project estimates are provided in the tables below: <br /> <br />General Trail Construction 950,221$ <br />Boardwalk 710,042$ <br />Retaining Walls 511,034$ <br />Stormwater BMP and Sewer 1,023,427$ <br />Construction Sub-Total 3,194,724$ <br />Construction Contigency (10%)319,472$ <br />Engineering (20%)638,945$ <br />Easements/Acquisitions 300,000$ <br />Total Project Cost 4,453,141$ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.