Laserfiche WebLink
Core #: ST-5 Project: B2502087 <br />Pavement thickness 11 inches Agg base thickness: 8 inches <br />Project Name: Arden Hills 2026 PMP <br />Date: April 1, 2025 <br />Notes: **Pavement core crumbled at the bottom. Hole measured to 11”. Upper 4 1/4", low <br />severity stripping. <br /> <br />Core #: ST-6 Project: B2502087 <br />Pavement thickness 9 inches Agg base thickness: 8 inches <br />Location: Arden Hills 2026 PMP <br />Date: April 1, 2025 <br />Notes: Moderate severity throughout; Deterioration about 1 1/2 inches.