Laserfiche WebLink
<br />Core #: ST-7 Project: B2502087 <br />Pavement thickness 8 1/2 inches Agg base thickness: 5 inches <br />Project Name: Arden Hills 2026 PMP <br />Date: April 1, 2025 <br />Notes: Upper 4 1/2 inches, good condition; Bottom 4 inches, low to moderate severity stripping. <br /> <br />Core #: ST-8 Project: B2502087 <br />Pavement thickness 5 1/2 inches Agg base thickness: 2 inches <br />Location: Arden Hills 2026 PMP <br />Date: April 1, 2025 <br />Notes: Debonded at 2 1/4 inches; Upper 2 1/4 inches high deterioration; Bottom 3 1/4 inches, <br />low severity stripping.