My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-23-25-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
06-23-25-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2025 8:24:52 AM
Creation date
6/20/2025 7:30:40 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 3 <br /> <br /> <br />* Initial estimate subject to revisions during design phase <br /> <br />The $3.1 million project estimate is for BASE improvements only and does NOT include costs <br />for the sediment removal operations or the pump system improvements. Those costs will need to <br />be added above and beyond that budgeted number. <br /> <br />The improvements for this project are anticipated to include funding derived from special <br />assessments. The special assessment process must follow the City’s current special assessment <br />policy and maintain compliance with the requirements of Minnesota Statutes 429. A preliminary <br />assessment roll is prepared as part of the feasibility report, and can be reviewed within <br />Attachment A, Appendix C. The policy states that the City will assess fifty percent of the costs <br />associated with bituminous overlay for a typical residential street section and seventy percent of <br />the street project costs for commercial/industrial properties on a unit basis. <br /> <br />A general benefit appraisal is in progress and will provide additional information for council to <br />consider when setting the assessment rates on the project. <br /> <br />The anticipated special assessments for residential properties are estimated to be $3,880 for mill <br />& overlay areas and $5,850 for full-depth reclamation areas. For reference, the 2022 PMP for <br />full-depth reclamation was $4,958 for properties along Old Snelling and $5,834 for properties in <br />the Arden Oaks neighborhood. The 2024 PMP for full-depth reclamation was $6,045 and for mill <br />& overlay was $2,874. <br /> <br /> <br />Attachments <br />Attachment A – Draft Feasibility Report <br />Attachment B – Presentation slides <br />Category 2025-2029 CIP Proposed 2026 CIP <br /> <br />Initial Estimate <br />Streets/Trails $1,690,000 $2,100,000 $2,041,000 <br />Storm Drainage $500,000 $500,000 $395,000 <br />Sanitary Sewer $145,000 $200,000 $186,000 <br />Water Utility $120,000 $500,000 $467,000 <br />TOTAL $2,485,000 $3,300,000 $3,089,000
The URL can be used to link to this page
Your browser does not support the video tag.