My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-30-25-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
06-30-25-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 4:54:37 PM
Creation date
7/10/2025 4:45:21 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID: 63ACAE11-BF2F-4D18-8584-6E88FC07AE08 <br />Implementation Timeline <br />This timeline provides general guidance and understanding of your installation <br />process. While we typically complete installations 6-8 weeks after locations have <br />been finalized, delays can occur as noted in the timeline below: <br />REVIEW LOCATIONS <br />Confirm Camera Locations With Your Sales Representative <br />FLOCK: Your sales representative will present several viable options for camera locations <br />CUSTOMER: Review Deployment Plan & approve camera locations <br />PLEASE NOTE: If Public Works is required to move forward, please obtain approval <br />FINALIZE LOCATIONS <br />Prepare For Finalized Camera Locations <br />FLOCK: Confirm Deployment Plane and signed agreement. Flock will move forward with <br />next steps for locations that don't need permits (minimum 10 locations needed to move <br />forward with partial installation) <br />CUSTOMER: Prepare the below items, as needed <br />• If permits are required, begin application process <br />• If camera will be AC -powered, hire an electrician/street department <br />STEP 1 <br />Conduct On -site Survey & Place Flags <br />FLOCK: Flock technician conducts site survey to (1) evaluate/reconfirm solar or power <br />access, (2) check line of sight to the road, and (3) evaluate/reconfirm cellular service in <br />the area. When the technician deems the locations suitable, s/he will place a white flag <br />at each spot <br />PLEASE NOTE: If the initially determined locations don't meet Flock standards, we will <br />evaluate a new location, obtain customer approval, and redo a site survey. This may <br />push timeline for installation <br />STEP 2 40 <br />Call 811 <br />FLOCK: Flock Safety will coordinate with Call 811 to mark each camera location for <br />underground utilities within a 10-foot radius <br />PLEASE NOTE: Call 811 is a government service, so turnaround times may vary and is <br />outside of Flock control <br />STEP 3 41 <br />Schedule Installation <br />FLOCK: Flock will (1) ship any site specific material that the technician does not have <br />locally (2) schedule the installation date <br />STEP 4 40 <br />Install & Validate Cameras <br />FLOCK: After installation, your Onboarding Specialist will confirm that cameras are <br />capturing footage well and functioning properly. They will then give you full access to <br />the system along with helpful training resources <br />ONGOING -AS NEEDED 41 <br />Finalize Any Installation Needs <br />FLOCK: While we typically complete installations within 4 weeks of finalizing locations, <br />delays may occur due to external factors. In these instances, we will continue to work <br />through this process until your cameras are fully installed and operational <br />flock safety 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.