My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-30-25-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
06-30-25-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2025 4:54:37 PM
Creation date
7/10/2025 4:45:21 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID: 63ACAE11-BF2F-4D18-8584-6E88FC07AE08 <br />Implementation Service Briefs: Existing <br />Infrastructure vs Standard vs Advanced <br />Existing Infrastructure Implementation <br />COST: $150 per camera (one time cost) <br />Included In Scope: <br />Once designated locations are approved by the customer, as part of the Existing <br />Infrastructure Implementation Service Flock will perform the following: <br />• An in -person site survey to confirm the installation feasibility of a location <br />(location assessment, solar assessment, visibility review, etc.) <br />o Cameras need sufficient power. Since a solar panel is required per camera, <br />it can prevent adequate solar power if two cameras and two solar panels <br />are on a single pole (blocking visibility). Therefore <br />if relying on solar power, only one camera can be installed per pole. <br />• Confirm that a location is safe for work by following State utility locating <br />procedures. <br />• Each installation may include the following: <br />o Installation of camera and solar panel or AC adapter box on a suitable <br />existing pole <br />frock safety 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.