Laserfiche WebLink
Docusign Envelope ID: 63ACAE11-BF2F-4D18-8584-6E88FC07AE08 <br />■ Types of existing infrastructure such as existing utility, light, and traffic <br />signal poles. <br />■ Pole no higher than 8'-12' (approval at Flock Safety's discretion) <br />■ Flock will provide and mount an AC adapter unit that a qualified <br />electrician can connect to AC power following our electrical wiring <br />requirements. Flock is unable to make any AC connections or <br />boreholes in any material other than dirt, grass, loose gravel (or other <br />non-diggable material). Electrical work requiring a licensed electrician <br />and associated costs, not included in the scope. <br />o Access requiring up to a 14' using an A -frame ladder <br />o Standard MUTCD traffic control procedures performed by a Flock <br />technician <br />• Obtain a business license to operate in the city and state of camera location <br />Out Of Scope: <br />By default, Flock does not include the following as part of the Existing <br />Infrastructure Implementation Service but can provide a quote for sourcing at <br />an additional cost: <br />• Mounting on mast arms (always require bucket truck and traffic control) <br />• Call 811 'Call -before -you -Dig' system <br />• Installation of any poles including but not limited to <br />o Standard, 12' above grade Flock breakaway pole <br />o NCHRP 350 or MASH approved pole (as may be required for locations in <br />DOT right of way) <br />• A Bucket Truck for accessing horizontal/cross-beams and/or height above 14' <br />• Special equipment rentals for site access <br />• Site -specific engineered traffic plans <br />• Third -party provided traffic control <br />• State or city -specific specialty contractor licenses or unique attachment/ <br />connection requirements <br />• Custom engineered drawings <br />• Electrical work requires a licensed electrician. <br />frock safety 7 <br />