My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 06-29-1992
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1992
>
CC 06-29-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:10 PM
Creation date
11/9/2006 4:32:29 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Arden Hills Council <br /> <br />5 <br /> <br />June 29, 1992 <br /> <br />Has Arden Hills considered a storm water utility such as <br />other cities have adopted? <br /> <br />Councilmember Malone stated that Council is in the process <br />of considering a storm water utility, but such a program may <br />not address this type of situation. <br /> <br />Warren McGuire, 1553 Arden place: We were told when we <br />purchased our property that the existing pipe drained. We <br />have done some landscaping to our property and hauled in <br />some fill which has actually improved the drainage problems <br />being experienced by at the Noyed property at 3505 Ridgewood <br />Road. (Dale Noyed nodded in agreement.) <br /> <br />Brad Lis, 1548 Arden Place: If the direct route option is <br />used, I suggest some additional work such as culvert <br />replacement. <br /> <br />Councilmember Malone asked Graham if placement of the plpe <br />in the direct route option could be shifted somewhat. <br />Engineer Graham said that bends in the pipe create problems, <br />but minor realignment could be studied. Councilmember Growe <br />asked if tree loss could be avoided if the placement were <br />shifted. Graham said he would check, but reminded Council <br />that an existing power pole and the limited construction <br />path must also be considered. <br /> <br />Councilmember Malone commented that it is clear the <br />improvement needs to be done, however, questions relative to <br />easements using either option must be answered prior to a <br />decision. <br /> <br />MOTION: <br /> <br />Malone moved, seconded by Hicks, to: <br />1) Direct the City Attorney to determine easement <br />acquisition costs involved in addressing Arden <br />Place drainage problems using both of the options <br />outlined by the City Engineer; <br />2) Report findings to Council for consideration at <br />the July 20, 1992 Council worksession; <br />3) Continue the Arden place Improvement public <br />hearing at the July 27, 1992 Council meeting. <br />Motion carried unanimously (4-0). <br /> <br />Councilmember Malone advised the public that Council's July <br />20 worksession is an open meeting. <br /> <br />Council recessed briefly and reconvened. <br />
The URL can be used to link to this page
Your browser does not support the video tag.