My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 04-27-1992
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1992
>
CC 04-27-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:10 PM
Creation date
11/9/2006 4:32:34 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />Arde~ gills Counc~l <br /> <br />Apri,: 27, 1992 <br /> <br />property is tc be inc <br />are cal,:::;ulated, and "3 <br />upper T~lle~ Lane. <br /> <br />udec, 2) How cor~er lot assessments <br />whether to improve bo'th lower and <br /> <br />HeTreN: <br /> <br />Ma18TIe moved, seconded by Mahowald, that the following <br />findings have been arrived at regarding the ~ill~r LaBe <br />Improvement Project: <br />1) Constructicn 0: the e~tire Tille~ Lane ~2 <br />justified; <br />The Abrahamson property at :228 Carlto~ D~:ve <br />should be excluded from the assessment roll; <br />The assessments, as calculated by the City <br />Engineert for corner lots at 1102 Carlton Drive <br />and 1130 Tiller Lane are appropriate. <br />Motion carried unanimously (4-0). <br /> <br />") ~ <br />-, <br /> <br />~ \ <br />~ , <br /> <br />l-10':r!ON: <br /> <br />Malone moved, seconded by Mahowald, to adopt Resolution <br />92-30 Accepting Bid And Authorizing Execution Of <br />Contract In The Matter Of The 1992 ~iller ~ahe Street <br />Reconstr~ction Improvement. Motion ~arried ~nanimously <br />(1-0) . <br /> <br />. <br /> <br />},~OT I ON : <br /> <br />Hicks movedt seconded by Mahowald, to adopt Resolutioa <br />92-31 Adopting Final Assessment Roll with a proviso <br />that any assessment over $3,500 can be paid over a <br />pe~iod of eight years. Motion carried unanimous:y (4~ <br />0). <br /> <br />Th~ meeting recessed for a few minutes and recc.nvened at <br />9:05 p.m. <br /> <br />CDnTINUATION OF IMPF.OVEl1ENT <br />llEJl.!{ING _ON KEITHSON POND: <br /> <br />~t 9:05 p.m. I Mayor Sather reopened the improvement hearing <br />on Keithson Pond continued from March 9, 1992. City <br />Eng:neer Graham advised that this heari~g is an improvement <br />hearing and not a~ assessment hearing. <br /> <br />. <br /> <br />3:caha:n l"cport.ed that a:ter a ::lumber- of qT:.estioI1s arose at <br />ths March 9 hearing} ne~ bids were received :cr the Keithson <br />PonJ Improvement project and plans have been discussed with <br />concerned residents. He stated that the lowest bid received <br />before the March 9 hearing was approximately $28,800; the <br />low bid for the amended project is $34,514. He added that <br />the engi:1eers I l::'ecommendation is to award the project to the <br />low bidder, Machtemes Construction, Inc. He advised that, <br />based on the Machtemes bid and the 32% overhead rate <br />established in the City's Assessment Manual, the total <br />project ~ost is $45/558.48. <br />
The URL can be used to link to this page
Your browser does not support the video tag.