My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 04-12-1993
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1990-1999
>
1993
>
CC 04-12-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:12:14 PM
Creation date
11/9/2006 4:42:21 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />Arden Hills Council <br /> <br />3 <br /> <br />Apri 1 12, 1993 <br /> <br />Graham reviewed the schedule for 1993 Pavement Maintenance <br />Program, which called for 1) Assessment hearing to be held <br />May 10, 2) Awarding of the project June 4, 3) Construction <br />to commence in July 1993, and 4) Completion of the project <br />in August 1993. <br /> <br />Mayor Sather advised the public that if an individual <br />property is assessed more than a $500 assessment, that <br />assessment will be payable over a five year period with <br />interest; if an individual property is assessed less than a <br />$500 assessment, that assessment will be payable over a <br />three year period with interest. He added that there would <br />be no interest applied if the assessment were paid in full <br />within thirty days of the assessment hearing. <br /> <br />Names were called in the order listed on the guest register. <br />Comments made by citizens are as follows (not verbatim): <br /> <br />. <br /> <br />Gordon Fay, 1841 Gramsie Road - I am not opposed to this <br />improvement project, but I request that concrete curb and <br />gutter be installed at least for my property; I would be <br />willing to pay for it. It is important that the City review <br />the drainage situation at Fairview because drainage there is <br />blocked and creates drainage problems in other locations. <br /> <br />Jim Talbott, 1810 GramsiemB_oad - My home was built in 1961 <br />before Gramsie Road was completed. The home was built at an <br />appropriate elevation according to the street plan, but the <br />street plan was not followed, hence, there are water <br />drainage problems. I fear that if the street were raised, <br />even as insignificantly as 1-1/2 inches for overlay, there <br />would be an increased water drainage problem affecting my <br />property. <br /> <br />Graham said he would review any potential problem areas with <br />residents, City public works crew, and the contractor to <br />analyze what measures should be taken to enhance drainage. <br />He added that it is customary for the contractor to <br />"fea ther" the bi tuminous over! ay to match driveway <br />approaches as well as possible. <br /> <br />. <br /> <br />Ken Hanzalik, 1768 Venus Avenue - I and my neighbor, Walt <br />Harmer of 1776 Venus Avenue experience drainage problems <br />when there is a heavy rainfall. Mr. Harmer sent a letter to <br />the City regarding this matter, but received no response. <br />Perhaps we need a situation like that which exists at the <br />Dellview/Glen View Court area, or perhaps a new manhole <br />cover would help. When was road work last done on Venus <br />Avenue? Crystal Avenue had work done on it just last year <br />and it is already cracked. I support spending money wisely <br />and I don't think we need concrete curbs on these <br />
The URL can be used to link to this page
Your browser does not support the video tag.