My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-28-25-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
07-28-25-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2025 10:59:14 AM
Creation date
8/7/2025 10:49:42 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2026 thru 2030 <br />Capital Improvement Plan <br />Arden Hllls, MN <br />Project # 26-W-007 <br />Project Name Water System Model Update <br />Total Project Cost $42,750 Department Water Department <br />Type Operational Maintenance Category Utility Improvements <br />Priority 3Important Status Active <br />TCAAP No <br />Description <br />Conduct a Water System Model update. <br />justification <br />The last water model was conducted in 2019. Since then upgrades have been made at critical locations of the water distribution system. An update is needed to <br />show current conditions. <br />Expenditures <br />2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />Total <br />Planning/Design <br />42,750 <br />0 <br />0 <br />0 <br />0 <br />42,750 <br />Total 42,750 <br />0 <br />0 <br />0 <br />0 <br />42,750 <br />Funding Sources <br />2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />Total <br />Water Utility Funds <br />42,750 <br />0 <br />0 <br />0 <br />0 <br />42,750 <br />Total 42,750 <br />0 <br />0 <br />0 <br />0 <br />42,750 <br />76 <br />Produced Using Plan -It CIP Software Page 72 / 73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.