My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-11-25-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
08-11-25-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 7:59:45 AM
Creation date
8/8/2025 7:52:43 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dead End Hydrant Flushing 160 FTE labor hours required, 2 FTEs required, high priority. <br />Complete citywide in conjunction with the hydrant servicing each year. This flushing is necessary to <br />remove stagnant water from the watermain system. The stagnant water can give off an odor and have a <br />discoloration if not flushed annually. <br />Flush the Emergency Interconnect from Shoreview 40 FTE labor hours required, 2 FTEs required, <br />medium priority. Create a plan and coordinate with Shoreview PW to flush the interconnect near 3751 <br />Lexington Ave. <br />Gate Valve/Curb Stop Repairs 160 FTE Labor Hours required; 4 FTEs required High Priority. <br />The necessary repairs are outlined below. <br />• Smith Medical Campus west service GV replacement. 1265 Grey Fox Rd. Unable to key, the GV <br />may still function. Excavate down to the valve and inspect operation. Replace standpipe and <br />driveway concrete apron. <br />• Replace leaki <br />ohanna Blvd. <br />• 1120 Benton Way - Adjust gate valve box down in front of the hydrant located in the center island. <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.