Laserfiche WebLink
Annual Sanitary Sewer Cleaning 80 FTE labor hours required, 2 FTEs required, high priority. <br />The four maps below outline the sanitary sewer segments (shown in green) that are cleaned by PW on <br />an annual basis due to excessive buildup, low flow, or flat grade which create the need for additional <br />service to those lines each year. <br />W '10 <br />55 <br />n�rwn P.t <br />