My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-11-25-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
08-11-25-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 7:59:45 AM
Creation date
8/8/2025 7:52:43 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sanitary Sewer Lift Stations Preventative Maintenance- 300 FTE labor hours required, 1 FTE required, <br />high priority. <br />There are 14 lift stations in the City of Arden Hills. The City's lift stations are checked daily by the PW <br />maintenance staff. <br />Lift Station Wet Well Cleaning and Pump Maintenance 360 FTE labor hours required, 3 FTEs required, <br />high priority. <br />To ensure lift station wet wells are cleaned and their pumps are properly maintained, the PW <br />maintenance staff performs the following duties in the spring and fall of each year: <br />• Clean wet wells. <br />• Remove grease, solids, and organics from floats, transducers, pumps, rails, walls and floors. <br />• Remove pumps and inspect tolerances, volutes, impellers, flush valves (where applicable) motor <br />oil or coolant levels and quality. <br />• Create a plan for any part replacement needs as needed during inspection and make needed <br />repairs. <br />• Test all alarms and verify the monitoring system is functioning properly. <br />• Inspect the control panel and report any issues in overall condition and functionality. <br />Lift Station Location Maps <br />56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.