Laserfiche WebLink
Sanitary Sewer Lift Stations Preventative Maintenance- 300 FTE labor hours required, 1 FTE required, <br />high priority. <br />There are 14 lift stations in the City of Arden Hills. The City's lift stations are checked daily by the PW <br />maintenance staff. <br />Lift Station Wet Well Cleaning and Pump Maintenance 360 FTE labor hours required, 3 FTEs required, <br />high priority. <br />To ensure lift station wet wells are cleaned and their pumps are properly maintained, the PW <br />maintenance staff performs the following duties in the spring and fall of each year: <br />• Clean wet wells. <br />• Remove grease, solids, and organics from floats, transducers, pumps, rails, walls and floors. <br />• Remove pumps and inspect tolerances, volutes, impellers, flush valves (where applicable) motor <br />oil or coolant levels and quality. <br />• Create a plan for any part replacement needs as needed during inspection and make needed <br />repairs. <br />• Test all alarms and verify the monitoring system is functioning properly. <br />• Inspect the control panel and report any issues in overall condition and functionality. <br />Lift Station Location Maps <br />56 <br />