Laserfiche WebLink
The list below are parks with rain shelters. Rain shelters will be inspected annually, and inspection <br />results will be tracked for preventative maintenance and annual budgeting/planning. <br />• Arden Manor Park <br />• Royal Hills Park <br />• Floral Park <br />• Cummings Park <br />• Hazelnut Park <br />• Ingerson Park <br />• Johanna Marsh <br />Hard Court Maintenance 120 FTE Labor Hours estimated; 2 FTEs required Medium Priority. <br />For each location below: <br />• Cummings Park, double tennis court and attached basketball court. Last resurfaced- 2020 <br />o Install tennis nets, remove debris, crack fill courts (contractor). <br />• Arden Manor Park, basketball court <br />o Reconstruction potentially in 2025 <br />o Add a "rules and park hours sign" at the Arden Manor Park Basketball Court at the <br />request of the Arden Manor Homes Manager. <br />• Royal Park, tennis and basketball court. Reconstructed in 2020 <br />o Install tennis nets, remove debris, crack fill (contractor). <br />• Floral Park, tennis and basketball court <br />o Install tennis nets, remove debris <br />• Hazelnut Park, tennis and basketball court <br />o Install tennis nets, remove debris <br />o Scheduled for 2025 pavement rehabilitation <br />• Arden Oaks, basketball court <br />o Resurface/contracted park project in 2025. <br />• Freeway Park, basketball court <br />o Resurface/contracted park project in 2025. <br />• Ingerson Park, basketball court (last cracked filled in 2018) <br />o Pressure wash and crack fill court (contractor) Assess the condition, this park is <br />scheduled for a rehab project in 2027. <br />16 <br />