Miscellaneous Carryover Projects from 2024 <br />• A proposal was made in the 2024 PWWP to tap off the irrigation for a water source at the Perry <br />Dog Park. This item will be added to the 2025 PWWP to be completed as time allows. <br />• Continue efforts to add a drain tile system to the ball field at Floral Park which will discharge <br />water into the newly installed 2024 PMP drainage system. <br />• Buckthorn removal continued to be an ongoing effort for volunteers and the Institution <br />Community Work Crews (ICWC) crew as time allowed. There was more progress made in the <br />Chatham Open Space and Cummings Park areas in 2024, but more work will continue as time <br />and resources are available. The Floral Park buckthorn removal is now planned to be completed <br />with the Green Rivers Greening project scope in early 2025. <br />• Irrigation/drip line was not installed along Lake Shore Pl. retaining wall — to be completed Spring <br />2025. <br />• Full replacement of the mulch at the Valentine Park play structure <br />• Contracting the HVAC duct cleaning at the Cummings Park Pavilion. <br />Create a Full Park Asset List 60 FTE Labor Hours required; 1 FTEs required Low Priority. <br />• Include install year, determine useful life and proposed replacement date. Update assets into <br />GIS. <br />The PW Parks Lead Worker will track items throughout the year that can be added to the 2026 PWMP. If <br />the items are special projects, have budget estimates and quantities to the PW Superintendent by July <br />15Y, 2025. <br />19 <br />