Laserfiche WebLink
Misc. to be completed prior to June 1" JPA Street Maintenance 120 FTE Labor Hours required; 3 FTEs <br />required High Priority. <br />• Clean out riprap of sediment at City Hall parking lot prior to JPA Fog Seal. <br />• Shouldering install on Lakeshore Place prior to JPA Fog Seal. <br />• Street repairs to Snelling Ave N prior to JPA Fog Seal. <br />Pothole Patching 480 FTE Labor Hours required; 4 FTEs required High Priority. — Public Works fills <br />potholes citywide twice annually. Operations begin as temperatures start to rise at the end of winter <br />and potholes begin to form. In the early weeks, Public Works will use a "cold -mix" type of fill material to <br />fill in severe potholes until bituminous plants open (usually late March/early April) and we can purchase <br />"hot -mix" material. The next full citywide pothole patching operations will happen in the fall to prepare <br />for winter plowing. Throughout the summer months Public Works will address potholes as they are <br />noticed or reported. <br />Spot mill and patching 480 FTE Labor Hours required; 4 FTEs required High Priority. - will be completed <br />by PW staff within the red highlighted streets on the map below. This work is in preparation for the <br />2026 seal coating/crack filling maintenance project. The projected 6-year street maintenance cycle is <br />primarily for sealcoat and crack filling maintenance planning. <br />NOR <br />I <br />1 <br />�r <br />.�Hm <br />6-Year Street Maintenance Cycle <br />22 <br />