Laserfiche WebLink
Note: Look ahead to County project work impacting city utilities on County Rd D and New Brighton Rd <br />for County Project scheduled for 2026. <br />Street Sweeping 480 FTE Labor Hours required; 2 FTEs required High Priority. — Public Works performs <br />street sweeping operations citywide twice annually. Operations occur in the spring typically as the snow <br />has melted away from the curb line and again in the fall towards the end of leaves falling. Sweeping <br />occurs as needed during the summer months primarily as a result of storm damage. Street sweeping is a <br />large contributor of improved water quality and also included in our MS4 permitting process. If time <br />allows, Public Works will perform an additional round of sweeping in the fall within areas of heavy <br />foliage and spot sweeping after summer storms. <br />• Create a map of the heavy foliage areas. <br />2026 PMP — Public Works Maintenance Involvement 80 FTE Labor Hours required; 2 FTEs required High <br />Priority. <br />• Utility locating and other misc. needs during the feasibility process. <br />• Field inspect street signage within the project corridor and report replacement needs <br />• Measure sanitary sewer structure ring stack thickness in inches, update on Collector <br />23 <br />