My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-11-25-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
08-11-25-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 7:59:45 AM
Creation date
8/8/2025 7:52:43 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Curb repair at 1931 Noble Rd. 5 FTE Labor Hours required; 1 FTEs required Low Priority <br />Resident Request <br />Description <br />Notes <br />Status <br />Prorlty <br />Location <br />Assigned on Date <br />Editor <br />Creator <br />0 <br />Repair cracked curb with <br />sealant. Call David <br />Swearingen prior to work. <br />I put a tube of concrete <br />sealant on your table to <br />try. Call Jeff with any <br />questions. Fit this job in <br />when available between <br />locates. <br />Needs more than just <br />crack filler <br />Completed <br />High <br />1931 Noble Rd <br />6/5/2023.8S3 AM <br />Joe.Mooney <br />DavA-Swearingen <br />Lake Johanna Blvd. Plastic Bollards (Coordinated with Ramsey County) (per event) 64 FTE Labor Hours <br />estimated; 4 FTEs required; Low Priority.— In 2024, plastic bollards were installed along the northbound <br />shoulder on LJB near Stowe Ave to County Rd E at the request of City Council. Ramsey County provides <br />the material and performs the installation and removal of the bollards annually outside of Winter <br />months. Arden Hills PW is responsible for any repairs needed during the time at which they are installed. <br />The repair operations require multiple staff to perform the repair and traffic control (flagging). <br />Solicitation Signs Code Enforcement (per policy created in 2023) 25 FTE Labor Hours estimated; 1 FTE <br />required; Medium Priority. <br />W. <br />
The URL can be used to link to this page
Your browser does not support the video tag.