My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-11-25-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
08-11-25-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 7:59:45 AM
Creation date
8/8/2025 7:52:43 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2025 Surface Water Maintenance Plan <br />Public Works Surface Water maintenance ensures the existing infrastructure and BMPs (Best <br />Management Practices) function properly by providing adequate drainage to prevent flooding and <br />debris capture to promote water quality. <br />Through inspections by Public Works staff performed in the fall of 2024, repairs needed are reported on <br />the plan sheets attached (at the end of the surface water section). To perform inspections and plan for <br />2025 repairs, there will be the occasional need to remove/clear vegetation and trees within easement <br />areas. Notices will be sent to affected properties providing them information of what the work is for and <br />a timeline of activities. <br />BMP's include: <br />• Rain Gardens <br />• Detention or Retention Ponds <br />• Grit Chambers <br />• Infiltration Basins <br />• Swales/Open Ditches (vegetated) <br />• Collection system — Catch basin, sewer mains <br />• Underground Storage Facilities <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.