Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />, <br /> <br />Minut.s of R.gular Council M..ting <br />Village of Ard.n Hills <br />Monday, July 11, 1983 - 7:30_p.m. <br />Village Hall <br /> <br />Call to Ord.r <br /> <br />Pursuant to due call and notic. tb.reof, Mayor Woodburn call.d <br />tb. ...ting to order at 7:33 p.m. <br /> <br />Roll Call <br /> <br />Present - <br /> <br />MayoD Robert Woodburn, Councilmen Thomas Mulcaby, <br />Micbael Christiansen, Diane McAllister, Dale Hicks <br /> <br />Absen t - None <br /> <br />Also Present - Engin.er Donald Christoff.r.en, Plann.r Orlyn <br />Miller, Clerk Administrator Charlott. McNiesb, <br />D.puty Clerk Dorotby Zehm <br /> <br />Approval of Minutes <br /> <br />Hulcahy moved, ..conded by Hick., that tbe Minut.. of <br />Council He.ting of June 27tb be approved a. amend.d. <br />car.ried unanimously. (5-0) <br /> <br />the Resular <br />Motion <br /> <br />Bu.ines. from the Ploor <br /> <br />Non. <br /> <br />REPORT OP VILLAGE ENGINEaR DONALD CHRISTOPPERSEN <br /> <br />Status R.port- IP_A Peasibility Study on Tampor.ry Wat.r Supply <br /> <br />Council wa. r.ferred to copy of Cbristoffersen's lett.r to IPA <br />(copy also to PCA). Cbri.toff.rs.n reported tbat Arden Hills <br />is included as part of Group 2, wbich includes tbe 7 bou.e. north <br />of Highway 96 (on Higbway 10), soutb of the railroad spur; plan <br />proposal is to install a 4" pipe, connecting tbe.e homes to tb. <br />Arden Manor water sy.t.m, and a 3" line connectins Stewart Lumber <br />Co. to tbe Arden Manor water system; proposal also includes <br />connecting tbe Indykiewicz house to Arden Hills water at a cost <br />of $8.800. <br /> <br />Chri.tbffer.en reported that hi. l.tter, in re.pon.. to the I~A <br />propo.al. doe. not obligate the City to anything; intent of <br />l.tt.r is to advi.e IPA of the City'. recommendationa. wbich are: <br /> <br />- 2400 feet of 12" water main from Highway 96 municipal water <br />to .erve the homes north of Highway 96, and 400 fe.t of <br />8" main continuing north to Stewart Lumb.r. Cbri.toffersen <br />explained that th.s. line size. are approved by the State <br />of Hinn.sota and provide for fir. flow connection.; not.d <br />that the Ard.n Manor sy.tem i. not rated for fir. flow. <br /> <br />- Christoffers.n estimat.d the differ.nc. in co.t to be $40-50 <br />thousand more than the $86,000-$86.500 .stimat. + $8.800 <br />for the indyki.wicz service. <br /> <br />- Christoff.r.en sugg.st.d that if the City undertake. this <br />improv.m.nt, it also include the segment of home. .outh <br />of Highway 96 (all of whicb would be .ubject to City <br />ass..sment and not included in the super fund); noted that <br />the servic.. for the bom.. north of 96 with contaminated <br />well. may b. into the building; not.d that the differ.nce <br />in east betw.en-8uper fund and improvem.nt co.t. can be <br />a.a....d. <br /> <br />Approval of Plan. and Specifications and .Authorization for <br />Adverti..ment for Bid.- Lift Station No.2 <br /> <br />Chri.toff.raen e.timated the co.t of the improve.ent at $143.000; <br />